1 |
T.W. Kang, "BIM-based Smart Facility Management Framework for Existing Buildings," Review of Architecture and Building Science, vol. 62, no. 6 pp.37-42, 2018.
|
2 |
T.W. Kang, "Study on 3D Image Scan-based MEP Facility Management Technology," Korea Institute of BIM, vol. 6, no. 4, pp.18-26, 2016. DOI: http://dx.doi.org/10.13161/kibim.2016.6.4.018
DOI
|
3 |
J.I, Jung, J.S, Cho, T.G, H, "Automated Silhouette Extraction Method for Generating a Blueprint from 3D Scan Data of Cultural Asset," International JOURNAL OF CONTENTS, vol. 8, no. 12, pp.10-19, 2018. DOI: http://dx.doi.org/10.5392/JKCA.2008.8.12.010
DOI
|
4 |
J.H, Jung, S.H, Yoon, J. Heo, "A Study on 3D Indoor mapping for as-built BIM creation by using Graph-based SLAM," Korea Journal of Construction Engineering and Management, vol. 17, no. 3, pp.32-42, 2016. DOI: http://dx.doi.org/10.6106/KJCEM.2016.17.3.032
DOI
|
5 |
T.W. Kang, "Development Considerations for Reverse Engineering Guidelines for AEC," Korea Institute of BIM, vol. 5, no. 4, pp23-29, 2015. DOI: http://dx.doi.org/10.13161/kibim.2015.5.4.023
DOI
|
6 |
P. Kim, J. Chen, Y.K. Cho, "SLAM-driven robotic mapping and registration of 3D point clouds," Automation in Construction, vol. 89, pp.38-48, 2018. DOI: http://dx.doi.org/10.1016/j.autcon.2018.01.009
DOI
|
7 |
D.M.P Nguyen, Q. Yann, L. Sylvain, L. Claire, "Scanner path planning with the control of overlap for part inspection with an industrial robot," The International Journal of Advanced Manufacturing Technology, vol. 98, no. 1, pp.629-643, 2018. DOI: http://dx.doi.org/10.1007/s00170-018-2336-8
DOI
|