1 |
S. H. Lee, Calculation of Maximum Effective Temperature of Steel Box Girder Bridge Using Artificial Neural Network, Journal of the korea Academia-Industrial cooperation Society, Vol.19, No.3, pp.96-103, 2018. DOI: http://dx.doi.org/10.5762/KAIS.2018.19.3.96
DOI
|
2 |
S. H. Lee, H. K. Shin, K. N. Kim, Estimation of the Maximum Design Effective Temperature for Steel Box Girder Bridges Considering Asphalt Thickness of Concrete Deck, Journal of the Korean Society of Steel Construction, KSSC, Vol.30, No.5, pp.299-307, 2018. DOI: https://doi.org/10.7781/kjoss.2018.30.5.299
DOI
|
3 |
Ministry of Land, Infrastructure and Transport, Highway Bridge Design Criteria(in Korea)(Limit state design method), 2015.
|
4 |
AASHTO LRFD Bridge Design Specifications (SI Units, 4th Edition), pp.3-99-3-104, 2007.
|
5 |
Roeder, C. Proposed Design Method for Thermal Bridge Movements, Journal of Bridge Engineering, Vol.8, No.1, pp.12-19, 2003. DOI: https://doi.org/10.1061/(ASCE)1084-0702(2003)8:1(12)
DOI
|
6 |
British Standards Institution, Steel, Concrete and Composite Bridges, Part 2. Specification for loads, appendix E. BS5400: pp.20-23, 2004.
|
7 |
D. W. Shin, K. N. Kim, An Experimental Study on the Temperature Difference between the Top and Bottom Flange in Steel Girder without Concrete Slab, Journal of the Korea Institute for Structural Maintenance and Inspection, Vol. 18, No. 4, pp.099-106. 2014. DOI: http://dx.doi.org/10.11112/jksmi.2014.18.4.099
|
8 |
S. H. Lee, Y. C. Park, A Study on the Vertical Temperature Difference of Steel Box Girder Bridge by Field Measurement, Journal of the korea Academia-Industrial cooperation Society, Vol. 19, No. 8, pp.545-551, 2018. DOI: http://dx.doi.org/10.5762/KAIS.2018.19.8.545
DOI
|
9 |
H. K. Shin, K. N. Kim, k. S. Jung, An Experimental Study for Estimation of effective temperature for design in Steel Box Girder Bridge, Journal of korean Society of Steel Construction, Vol. 28, No. 6, pp.449-458, 2016. DOI: https://doi.org/10.7781/kjoss.2016.28.6.449
DOI
|