1 |
F. Wang, L. Zhou, H. Ren, X. Liu, M. Shafie-Khah, J. P. S. Catalao, "Multi-objective optimization model of source-load-storage synergetic dispatch for building energy system based on TOU price demand response", 2017 IEEE Industry Applications Society Annual Meeting, pp.1017-1028, Mar. 2018. DOI: https://dx.doi.org/10.1109/IAS.2017.8101713
|
2 |
S. J. Lee, J. C. Lee, "BIPV System Design to Enhance Electric Power Generation by Building up a Demonstration Mock-up and Analyzing Statistical Data", Journal of the Korea Academia-Industrial cooperation Society, Vol.19, No.6, pp.587-599, June 2018. DOI: https://dx.doi.org/10.5762/KAIS.2018.19.6.587
|
3 |
OMG Systems Modeling Language, v.1.5, pp.35-220, 2017.
|
4 |
A. Gutierrez, H. R. Chamorro, J. F. Jimenez, L. F. L. Villa, C. Alonso, "Hardware-in-the-loop simulation of PV systems in micro-grids using SysML models", Proceedings of 2015 IEEE 16th Workshop on Control and Modeling for Power Electronics, Vancouver, Canada, July 2015. DOI: https://dx.doi.org/10.1109/COMPEL.2015.7236466
|
5 |
A. Gutierrez, H. R. Chamorro, J. F. Jimenez, L. F. L. Villa, C. Alonso, "SysML methodology for HIL implementation of PV models", Proceedings of 2015 17th European Conference on Power Electronics and Applications, Geneva, Switzerland, Sep. 2015. DOI: https://dx.doi.org/10.1109/EPE.2015.7309196
|
6 |
D. N. Luta, A. K. Raji., "A SysML based hybrib photovoltaic-wind power system model", Journal of Energy Technology Research, Vol.1, No.2, pp.1-12, Aug. 2017. DOI: https://dx.doi.org/10.22496/jetr.v1i2.75
DOI
|
7 |
Photovoltaics in buildings - Part 2: BIPV Systems, BS EN 50583-2, 2016.
|
8 |
R. Chedid, Saifur Rahman., "A decision support technique for the design of hybrid solar-wind power systems", IEEE Transactions on Energy Conversion, Vol.13, No.1, pp.76-83, Mar. 1998. DOI: https://dx.doi.org/10.1109/60.658207
DOI
|
9 |
H. Sozer, M. Elnimeiri, "Critical Factors in Reducing the Cost of Building Integrated Photovoltaic (BIPV) Systems", Architectural Science Review, Vol.50, No.2, pp.115-121, June 2011. DOI: https://dx.doi.org/10.3763/asre.2007.5017
DOI
|
10 |
P. Bonomo, F. Frontini, P. De Berardinis, I. Donsante, "BIPV:building envelop solutions in a multi-criteria approach. A method for assessing life-cycle cost in the early design phase", Advances in building energy research, Vol.11, No.1, pp.104-129, July 2017. DOI: https://dx.doi.org/10.1080/17512549.2016.1161544
DOI
|
11 |
S. Y. Lee, A. Y. Lee, "A Study on BIPV(Building Integrated Photovoltaic) Design Process based on the BIM(Building Information Modelling) for Architects", Journal of the architectural institute of korea planning & design, Vol.33, No.4, pp.49-57, Apr. 2017. DOI: https://dx.doi.org/10.5659/JAIK_PD.2017.33.4.49
DOI
|
12 |
R. J. Yang, P. X. W. Zou, "Building integrated photovoltaics (BIPV): costs, benefits, risks, barriers and improvement strategy", International Journal of Construction Management, Vol.16, No.1, pp.39-53, Dec. 2015. DOI: https://dx.doi.org/10.1080/15623599.2015.1117709
|
13 |
E. Scolari, F. Sossan, M. Paolone, "Photovoltaic-Model-Based Solar Irradiance Estimators: Permance Comparison and Application to Maximum Power Forecasting", IEEE Transaction on Sustainable Energy, Vol.9, No.1, pp.35-44, Jan. 2018. DOI: https://dx.doi.org/10.1109/TSTE.2017.2714690
DOI
|