1 |
J. J. Jung, C. S. Kim, "Evaluation of Optimal Time Between Overhaul Period of the First Driving Devices for High-Speed Railway Vehicle", J. of the Korea Academia-Industrial cooperation Society, vol. 16, no. 12, pp. 8700-8706, 2015. DOI: http://doi.org/10.5762/KAIS.2015.16.12.8700
DOI
|
2 |
J. Y. Park, I. T. Lim, "Development of Interface Inspection System for On-board Signal Equipment", J. of the Korea Academia-Industrial Cooperation Society, vol. 15, no. 4, pp. 2324-2329, 2014. DOI: https://doi.org/10.5762/KAIS.2014.15.4.2324
DOI
|
3 |
J. H. Lee, K.M. Lee, P.S. Park, "Implementation & Application of Instrumentation System on Performance Evaluation for Korea-Radio Train Control System", The Trans. of the Kor. Inst. of Elec. Eng., vol. 62, no. 12, pp. 1777-1783, 2013.
DOI
|
4 |
A. F. Rumsey, Hubbsy, "Implementing Communication Based Train Control at New York City Transit", Proc. of Seminar on Train Protection-The way Forward, Institution of Mechanical Engineers, 2003.
|
5 |
Bin Ning, "Intelligent Railway System in the 21st Century", Computer in Railways VII, WIT Press, pp. 1153-1163, 2000.
|
6 |
Neotrans Co. LTD. "Sin-Bundang Metro Subway Line Signal System TCMS Console Technical Specification", DX-line Internal Report, 2011.
|
7 |
Neotrans Co. LTD. "Sin-Bundang Metro Subway Line Signal System CBTC Technical Specification", DX-line Internal Report, 2014.
|