1 |
KORAIL Institute. "Process research and requirements for the development Eletrical Point machine".Basic research project. Dec, 2010.
|
2 |
SEOUL METRO. "Human Resource Development Signal Textbooks", Dec, 2014.
|
3 |
Kyu-Hyoung Choi, Young-Hwan Kho, Sun-Ho Yoon, "A Study on the EMI between ATS and ATP/ATO Systeme", The Korean Society of Automotive Engineers, Con., 2009.
|
4 |
Rag-Gyo Jeong, Baek-Hyun Kim, Seok-Won Kang, Young-Hwan Kho, "Study on the Design of Operation Scenario for Replacement of a Railway Signaling System", korean institute of electrical engineers, con., vol. 63, no. 8, pp. 1064-1025, Aug. 2014. DOI: http://dx.doi.org/10.5370/KIEE.2014.63.8.1064
DOI
|
5 |
Rag-Gyo Jeong, Baek-Hyun Kim, Seok-Won Kang, Geon-Won Park, "Prevention of the malfunction of the ATS signaling system by parallel operation with ATC", Korean institute of electrical engineers, con., vol. 64, no. 7, pp. 1019-1025, Jul. 2015. DOI: http://dx.doi.org/10.5370/KIEE.2015.64.7.1019
|
6 |
Geon-Won Park, "Reduction the Failure Recovery Time through the Improvement of NS Point Machine-wiring set", Seoul National University of Science and Technology, Feb. 2016.
|