1 |
KR (2013) Ballast Track Structures, KR C-14030, Korea Rail Network Authority.
|
2 |
KR (2012) Track-Bridge Longitudinal Interaction Analysis, KR C-08080, Korea Rail Network Authority.
|
3 |
UIC (2001) Track/bridge Interaction Recommendations for Calculations, UIC Code 774-3, International Union of Railways, pp.2-8
|
4 |
R. J. van't Zand and ing. J. Moraal (1997) Ballast Resistance under Three-Dimensional Loading, ERRI D 202/DT 362, European Rail Research Institute.
|
5 |
C. Esveld (1997) Improved knowledge of CWR track, Delft University Press.
|
6 |
K.-C. Lee (2014) Feasibility Analysis of Sliding Slab Track for Reducing Track-Bridge Interaction, Proceedings of 2014 Spring Conference of the Korean Society for Railway, pp.916-920.
|
7 |
M.-C. Kim, Y.-H. Bae, and Y.-G. Park (2014) Experimental Study on the Improvement Measures of Ballasted Tracks Considering the Speed-up of Conventional Lines, Proceedings of 2014 Spring Conference of the Korean Society for Railway, pp.1669-1676.
|