1 |
M. S. Horritt, P. D. Bates, "Evaluation of 1D and 2D Numerical Models for Predicting River Flood Inundation", Journal of Hydrology, Vol.268, No.1, pp. 87-99. DOI: http://dx.doi.org/10.1016/s0022-1694(02)00121-x
DOI
|
2 |
V. Tayefi, S. N. Lane, R. J. Hardy, D. Yu, "A Comparison of One and Two-dimensional Approaches to Modelling Flood Inundation Over Complex Upland Floodplains", Hydrological Processes, Vol.21, No.23, pp. 3190-3202. DOI: http://dx.doi.org/10.1002/hyp.6523
DOI
|
3 |
S. M. Kang, M. J. Park, S. H. Kim, S. J. Kim, "A Study on the Mitigation of Inundation Damage Using Flood Inundation Analysis Model FLUMEN - For the Part of Jinwicheon Reach", Journal of Korean Society of Civil Engineers, Vol.27, No.6, pp. 583-590, 2007.
|
4 |
W. H. Cho, K. Y. Han, K. H. Ahn, "Flood Risk Mapping with FLUMEN Model Application", Journal of Korean Society of Civil Engineers, Vol.30, No.2, pp. 169-177, 2010.
|
5 |
K. H. Lee, S. S. Lee, G. S. Jung, "Development of a Raster-based Two-dimensional Flood Inundation Model", Journal of Korean Society of Hazard Mitigation, Vol.10, No.6, pp. 155-163, 2010.
|
6 |
C. G. Choi, Y. S. Choi, G. T. Kim, "Comparison and Evaluation of the Inundation Areas by Levee Breaching using LISFLOOD", Journal of Korean Wetlands Society, Vol.16, No.3, pp. 383-392, 2014. DOI: http://dx.doi.org/10.17663/jwr.2014.16.3.383
DOI
|
7 |
Ministry of Land, Transport and Maritime Affairs , Sapkyo-cheon Watershed River Master Plan Report, 2012.
|
8 |
Ministry of Land, Infrastructure and Transport, Geumgang Flood Risk Mapping Report, 2015.
|
9 |
Ministry of Land, Transport and Maritime Affairs , Flood Risk Maps Master Plan Report, 2008.
|