1 |
Foong, S.L., Shiozaki, Y. &Horita, Y. "Evaluation of the Reconstruction Plans for Tsunami Disaster victims in Malaysia", Journal of Asia Architecture and Building Engineering, Vol. 5, No. 2, pp. 293-300, November, 2006. DOI: http://dx.doi.org/10.3130/jaabe.5.293
DOI
|
2 |
Kim, Hyun-Soo and Kim, Hong-Moon, " A study on cross sectional characteristics and available area for using the lower space in TBM road tunnels", Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 2, pp. 141-157, 2012. DOI: http://dx.doi.org/10.9711/KTAJ.2012.14.2.141
DOI
|
3 |
Ministry of Land Transport and Maritime Affairs, Feasibility Study Report for the Joongrang Choen SMART Construction, 2007.
|
4 |
Ministry of Land, Transport and Maritime Affairs, Rivers design standards, 2009.
|
5 |
Ministry of Land, Transport and Maritime Affairs, Road design standards, 2012
|