1 |
Shamir, U. and Howard, C. D, "An Analytic Approach to Schedulimg Pipe Replacement", Journal of the American Water Works Association, Vol. 71, No. 5, pp.248-258, May, 1979
DOI
|
2 |
Goulter, I. Davidson, J. and Jacobs, P, "Predicting Water-Main Breakage Rate", Journal of Water Resources Planning and Management, Vol. 119, No. 4, 1993. DOI: http://dx.doi.org/10.1061/(ASCE)0733-9496(1993)119:4(419)
DOI
ScienceOn
|
3 |
H.J. Kim, "Water distribution system in the study of the optimal decision irrigation amount", The Graduate School of Korea University, 1994
|
4 |
J.H. Kim, Z.W. Kim, H.J. Kim, T.G. Kim, "A Study on the Optimal Location of Pumping Stations in Branched Pipeline Systems", Korean Society of Civil Engineers, Vol. 16 No. 2-4, pp. 361-369, 1996
과학기술학회마을
|
5 |
W.S. Jung, H.D. Lee, P.J. Kwak, J.H. Kim, E.S. Kim, "Development of deterioration evaluate method system for pipe network" The korean society of water and wastewater and korean society of water quality, pp. 241-44, 2000
|
6 |
J. H. Kim, "The study of obsolete pipeline corrosion factor and corrsion rate", The Graduate School of Chungbuk University, 2002
|