1 |
X. Liu, G. Duelen, and H. Stahlmann, "An Off-line Planning and Simulation System of the Programming of Coating Robots", CIRP Mfg. Tech., Vol. 38, No.1, pp. 369-372, 1989. DOI: http://dx.doi.org/10.1016/S0007-8506(07)62725-5
DOI
ScienceOn
|
2 |
Z. Fu, L. Zou, Y. Wu, P. Li and Y. Zhao, "Automatic coating and fastening robot of space solar module to solar panel substrate", Assembly Automation, Vol. 28, No. 4, pp.301-307, 2008. DOI: http://dx.doi.org/10.1108/01445150810904459
DOI
ScienceOn
|
3 |
S. H. Suh and I. K. Woo, "An Integrated Robot-Trajectory-Planning Scheme for Spray Painting Operations", IE Interface, Vol. 3, No. 2, pp. 23-38, 1990.
과학기술학회마을
|
4 |
Y. H. Cho, "Recent Trend of Painting Automation System and Painting Robot.", J. of New Coating, Vol. 25, pp.52-59, 2010.
|