1 |
Ministry of Government Legislation, "Regulation of Railway Construction Criteria", Article 28 and 29, Ministry of Land, Transport and Maritime Affairs, 2009.
|
2 |
Korea Institute of Construction & Transportation Technology Evaluation and Planning, "The Planning Report on the Development Plan of Door System of Low and High Level Platforms, pp. 13-179, Ministry of Land, Transport and Maritime Affairs, 2010.
|
3 |
C. H. An, D. S. Lee, Y. J. Son and H. S. Lee, " A Study for Reliability Improvement of Belt Type Door System using FMECA", Journal of the Korean Society for Railway, Vol. 13, No. 1, pp. 58-64, 2010.
과학기술학회마을
|
4 |
D. G. Lee, J. W. Kim and H. S. Lee, "A Case Study on Determining Doors Maintenance Intervals through Running Fault Data Analysis for Metro EMU", Journal of the Korean Society for Railway, Vol. 11, No. 3, pp. 240-247, 2008.
과학기술학회마을
|
5 |
C.S. Kim and G. H. Kang, "Fatigue Analysis of Reduction Gears Unit in Rolling Stock Considering Operating Characteristics", Journal of The Korea Academia-Industrial cooperation Society, Vol.12, No.3, pp. 1085-1090, 2011.
과학기술학회마을
DOI
ScienceOn
|
6 |
B. J. Hyen, et al.,"Analysis of EMU Installation and Yard Test for Communication Based Train Control On-board Equipment", Journal of The Korea Academia- Industrial cooperation Society, v.10, no.5, pp. 935-941, 2009.
과학기술학회마을
DOI
|
7 |
Korea Standard Association, "KS R 9246; Pneumatic Door System Used on Railway Rolling Stock", pp. 1-14, Korean Agency for Technology and Standards, 2007.
|
8 |
Korea Standard Association, "KS R 9247; Electric Door System Used on Railway Rolling Stock-Test Methods", pp. 1-8, Korean Agency for Technology and Standards, 2007.
|
9 |
Korean Railway Standards, "KRS CB 0001-07(R) Entrance Door for Electric Car", pp. 1-5, Ministry of Land, Transport and Maritime Affairs, 2007.
|
10 |
European Standards, "BS EN 14752; Railway Application -Body Entrance Systems", pp. 1-30, European Railway Agency, 2005.
|