1 |
Jee Y. K. & K.H.S & K.T.C & K.H.N, "Automation of Glasses frame Rim-Lock electric Welding", Journal of KIIEE, 1998, Vol.12, No.3, 22-28
|
2 |
Gun H. K. & K. S. K, "Optimum Design of Temple Machining Center", Korean Society for Precision Engineering, 1998, 1124-1127
|
3 |
시험성적서, 대구기계부품연구원, TE-04-01371, 2004
|
4 |
Sang-Yeoun Kim, "The Study of The PVD(physical vapor deposition) processing condition of Titanium Eyewear", 대구보건대학 논문집, 2008, V28, No1, 1-12.
|
5 |
Lee Y. Kim HJ. Hwang SM, "Analytic model for the prediction of mean effective strain in rod rolling process", Journal of Materials Processing Technology, 2001, V.114 N.2, 129-138.
DOI
|
6 |
Sang-Yeoun Kim, "The Study on Titanium wire rod by Kocks Mill process", 대구보건대학 논문집, 2009, V29, No1, 189-203.
|
7 |
Lee Y. Kim YH, "Approximate analysis of roll force in a round-oval-round pass rolling sequence", Journal of Materials Processing Technology, 2001, V.113 N.1-3, 124-130.
DOI
|
8 |
Lee Y. Choi S. Hodgson PD. "Integrated model for thero-mechanical controlled process in rod(or bar) rolling", Journal of Materials Processing Technology, 2002, V.12r 126, 678-688.
|