1 |
Kuhl, M. E. and Laubisch, G. R. 2004. A simulation study of dispatching rules and rework strategies in semiconductor manufacturing, IEEE/SEMI Advanced Semiconductor Manufacturing Conference.
DOI
|
2 |
Zargar, A. M., 1995. Effect Of Rework Strategies On Cycle Time, Computers & Industrial Engineering, 29(1/4), 239-243.
DOI
|
3 |
Lim, J.M., Bae, S.M. and Suh, J.J., 2006. A Learning based Algorithm for Traveling Salesman Problem, Journal of the Korean Institute of Industrial Engineers, 32(1), 61-73.
|
4 |
Liu, J. J. and Ping, Y., 1996. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs, European Journal of Operational Research, 91(3), 517-527.
DOI
|
5 |
Sha, D. Y., Hsu, S. Y., Che, Z. H., and Chen, C. H., 2006. A dispatching rule for photolithography scheduling with an online rework strategy, Computers & Industrial Engineering, 50, 233-247.
DOI
|
6 |
Teunter, R. H. and Flapper, S. D. P., 2003. Lot-sizing for a single-product production system with rework of perishable production defectives, OR Spectrum, 25, 85-96 .
DOI
|
7 |
Flapper, S.D.P., J.C. Fransoo, R.A.C.M. Broekmeulen and K. Inderfurth, 2002. Planning and control of rework in the process industries : review, Production Planning & Control, 13(1), 26-34.
DOI
|
8 |
Kang, Y.H., Kim, S.S. and Shin H.J. 2010. A dispatching algorithm for parallel machines with rework processes, Journal of the Operational Research Society, 61, 144-155.
DOI
|
9 |
Lee, Y.H. and Pinedo, M. 1997. Scheduling jobs on parallel machines with sequence-dependent setup times, European Journal of Operational Research, 100(3), 464-474.
DOI
|