1 |
Azizoglu, M., Koksalan, M., and Koksalan, S. K. (2003), Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed, Journal of the Operational Research Society, 54(6), 661-664.
DOI
ScienceOn
|
2 |
Clausen, J., Larsen, J., Larsen, A., and Hansen, J. (2001), Disruption management-operations research between planning and execution, OR/MS Today, 28(5), 40-43.
|
3 |
Graham, R. L., Lawler, E. L., Lenstra, J. K., and Rinnooy Kan, A. H. G. (1979), Optimization and approximation in deterministic sequencing and scheduling: a survey, Annals of Discrete Mathematics, 5, 287-326.
DOI
|
4 |
Garey, M. R. and Johnson, D. S. (1979), Computers and Intractability: A Guide to the Theory of NP-Completeness, Freeman, San Francisco, CA.
|
5 |
Guner, E., Erol, S., and Tani, K. (1998), One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs, International Journal of Production Economics, 55(2), 213-219.
DOI
ScienceOn
|
6 |
Hall, N. G. and Potts, C. N. (2004), Rescheduling for new orders, Operations Research, 52(3), 440-453.
DOI
ScienceOn
|
7 |
Hassin, R. and Khuller, S. (2001), z-Approximations, Journal of Algorithms, 41(2), 429-442.
DOI
ScienceOn
|
8 |
Johnson, D. S., Demers, A., Ullman, J. D., Garey, M. R., and Graham, R. L. (1974), Worst-case performance bounds for simple one-dimensional packing algorithms, SIAM Journal on Computing, 3(4), 299-325.
DOI
|
9 |
Karp, R. M. (1972), Reducibility among combinatorial problems. In: Miller, R. and Thatcher, J. W. (eds.), Complexity of Computer Computations, Plenum Press, New York, NY.
|
10 |
Kopanos, G. M., Capon-Garcia, E., Espuna, A., and Puigjaner, L. (2008), Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice, Industrial and Engineering Chemistry Industry, 47(22), 8785-8795.
DOI
ScienceOn
|
11 |
Mandel, M. and Mosheiov, G. (2001), Minimizing maximum earliness on parallel identical machines, Computers and Operations Research, 28(4), 317-327.
DOI
ScienceOn
|
12 |
Molaee, E., Moslehi, G., and Reisi, M. (2010), Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem, Computers and Mathematics with Applications, 60(11), 2909-2919.
DOI
ScienceOn
|
13 |
Ozlen, M. and Azizoglu, M. (2011), Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria, Journal of the Operational Research Society, 62, 152-164.
DOI
ScienceOn
|
14 |
Qi, X., Bard, J. F., and Yu, G. (2006), Disruption management for machine scheduling: the case of SPT schedules, International Journal of Production Economics, 103(1), 166-184.
DOI
ScienceOn
|
15 |
Unal, A. T., Uzsoy, R., and Kiran, A. S. (1997), Rescheduling on a single machine with part-type dependent setup times and deadlines, Annals of Operations Research, 70, 93-113.
DOI
|
16 |
Wu, S. D., Storer, R. H., and Chang, P. C. (1993), Onemachine rescheduling heuristics with efficiency and stability as criteria, Computers and Operations Research, 20(1), 1-14.
DOI
ScienceOn
|
17 |
Yang, J. and Posner, M. E. (2012), Rescheduling with order disruptions (Working Paper), The Ohio State University, Columbus, OH.
|