1 |
Hirotani, D., Myreshka, Morikawa, K., Takahashi, K. (2006), Analysis and design of the self-balancing production line, Computers and Industrial Engineering, 50, 488-502.
DOI
ScienceOn
|
2 |
McClain, J. O., Schultz K. L., and Thomas L. J. (2000), Management of worksharing systems, Manufacturing and service operations management, 2, 49-67.
DOI
|
3 |
Nakade, K., Ohno, K. (2003), Separate and carousel type allocations of workers in a U-shaped production line, Euro. J. Operational Research, 145, 403-424.
DOI
ScienceOn
|
4 |
Scholl, A. (1995), Balancing and Sequencing of Assembly Lines, Physica-Verlag, Heidelberg, NY.
|
5 |
Armbruster, D. and Gel, E. S. (2006), Bucket brigades revisited: are they always effective?, Euro. J. Operational Research, 172, 213-229.
DOI
ScienceOn
|
6 |
Bartholdi, J. J. and Bunimovich L. A. (1999), Dynamics of two- and three-worker 'Bucket Brigade' production lines, Oper. Res., 47, 488-491.
DOI
ScienceOn
|
7 |
Bartholdi, J. J. and Eisenstein, D. D. (1996), A production line that balances itself, Oper. Res., 44, 21-34.
DOI
ScienceOn
|
8 |
Bartholdi, J. J., Eisenstein, D. D., and Foley, D. D. (2001), Performance of bucket brigades when work is stochastic, Oper. Res., 49, 488-491.
|
9 |
Buzacott, J. A. (2002), The impact of worker difference on production system output, Int. J. Production Economics, 78, 37-44.
DOI
ScienceOn
|
10 |
Hirotani, D., Morikawa, K., and Takahashi, K. (2009), Analysis of self-balancing production line with stations, non preemption and constant working speed, Proceeding of the 9th Asia-Pacific Industrial Engineering and Management System Conference, Kitakyushu, Japan, 1986-1996.
|
11 |
Hirotani, D., Morikawa, K., and Takahashi, K. (2008), Analysis and design of self-balancing production line with large number of stations and workers, Proceeding of the 8th Asia-Pacific Industrial Engineering and Management System Conference, Bali, Indonesia, 936-943.
|