Browse > Article
http://dx.doi.org/10.7232/iems.2011.10.3.197

A New Worker Policy for Self-Balancing Production Line with Stations  

Hirotani, Daisuke (Faculty of Engineering, Hiroshima University)
Morikawa, Katsumi (Faculty of Engineering, Hiroshima University)
Takahashi, Katsuhiko (Faculty of Engineering, Hiroshima University)
Publication Information
Industrial Engineering and Management Systems / v.10, no.3, 2011 , pp. 197-202 More about this Journal
Abstract
In traditional production lines, such as assembly lines, each worker is usually assigned to a particular fixed work, and decreasing the task to master the assigned work is valuated. However, when an imbalance exists between workers' speeds, if a worker delays the overall work in the production line, the production rate of the particular line will also decrease. To avoid this problem, the "Self-Balancing Production Line" was introduced. In this type of production line, each worker is assigned work dynamically, and when specific conditions are satisfied, production remains balanced. Characteristics of these lines that can be preempted at any place have already been analyzed by some researchers. A previous paper examined the situation in which only a single worker can process one machine and cannot preempt processing, and the improved policy of an ordinary selfbalancing production line, which specifies which stations workers can process and how workers can behave. This policy achieveda high production rate with only four stations and two workers (Buzacott, 2002). In that paper, worker processing stations and the behavior of a specific worker were limited, andthe paper focused only on specific stations and workers. Therefore, it is not applicable to any worker sequence. In this paper, we focus on other ways to decrease cycle time. In this kind of line, a worker processes at his or her speed. Therefore, if a worker is assigned stations according to his or her speed, the line can decrease cycle time. To do so, we relax the assumptions of this type of line and set a new condition. Under these conditions, we compare our results to the results of previous papers.
Keywords
Self-Balancing; Production Line; Station;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Hirotani, D., Myreshka, Morikawa, K., Takahashi, K. (2006), Analysis and design of the self-balancing production line, Computers and Industrial Engineering, 50, 488-502.   DOI   ScienceOn
2 McClain, J. O., Schultz K. L., and Thomas L. J. (2000), Management of worksharing systems, Manufacturing and service operations management, 2, 49-67.   DOI
3 Nakade, K., Ohno, K. (2003), Separate and carousel type allocations of workers in a U-shaped production line, Euro. J. Operational Research, 145, 403-424.   DOI   ScienceOn
4 Scholl, A. (1995), Balancing and Sequencing of Assembly Lines, Physica-Verlag, Heidelberg, NY.
5 Armbruster, D. and Gel, E. S. (2006), Bucket brigades revisited: are they always effective?, Euro. J. Operational Research, 172, 213-229.   DOI   ScienceOn
6 Buzacott, J. A. (2002), The impact of worker difference on production system output, Int. J. Production Economics, 78, 37-44.   DOI   ScienceOn
7 Bartholdi, J. J. and Bunimovich L. A. (1999), Dynamics of two- and three-worker 'Bucket Brigade' production lines, Oper. Res., 47, 488-491.   DOI   ScienceOn
8 Bartholdi, J. J. and Eisenstein, D. D. (1996), A production line that balances itself, Oper. Res., 44, 21-34.   DOI   ScienceOn
9 Bartholdi, J. J., Eisenstein, D. D., and Foley, D. D. (2001), Performance of bucket brigades when work is stochastic, Oper. Res., 49, 488-491.
10 Hirotani, D., Morikawa, K., and Takahashi, K. (2009), Analysis of self-balancing production line with stations, non preemption and constant working speed, Proceeding of the 9th Asia-Pacific Industrial Engineering and Management System Conference, Kitakyushu, Japan, 1986-1996.
11 Hirotani, D., Morikawa, K., and Takahashi, K. (2008), Analysis and design of self-balancing production line with large number of stations and workers, Proceeding of the 8th Asia-Pacific Industrial Engineering and Management System Conference, Bali, Indonesia, 936-943.