Browse > Article
http://dx.doi.org/10.7232/iems.2010.9.3.215

Development of Information System for Product Redesign: Evaluation of Assembly Process and Characteristics of Product Functions  

Arakawa, Masahiro (Kansai University)
Publication Information
Industrial Engineering and Management Systems / v.9, no.3, 2010 , pp. 215-226 More about this Journal
Abstract
Since product design strongly depends on the experience and ability of the designers, and a long lead time is required for the product design stage, introducing a support system related to this experience and ability is an effective technique to reduce the lead time. In this paper, an information system is developed to support the development of engineering mechanisms with the evaluation of the assembly process on the basis of the abstract functions required for new products. The developed system is based on a database system involving the following data structure: (1) a hierarchical structure related to information about the product functions, (2) the relationship between the parts and engineering functions and/or mechanisms of products, and (3) the relationship between the parts and manufacturing characteristics. The system stores the relationships between the product functions, structure of parts, and assembly characteristics. This information can then be interactively retrieved using the data structure described in (1), (2), and (3). A procedure for designing new products is proposed that involves using the information about existing products. This paper presents the characteristics of the proposed procedure and the developed information system. In addition, a case study of the redesign of a simple structured robot by using the proposed procedure is discussed.
Keywords
Product Design; Database; Hierarchical Structure; BOM; Manufacturing Process; Product Functions;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Arakawa, M. (2008), Design of parts locations to improve assembly process, Proceedings of the 9th Asia Pacific Industrial Engineering and Management Systems Conference 2008, Bali, Indonesia, 2299-2310.
2 Fine, C. H. (1998) Clock Speed, Basic Book.
3 Lee, S. G., Ma, Y. S., Thimm, G. L., and Verstraeten, J. (2008), Production maintenance, repair and overhaul, Computers in Industry, 59, 296-303.   DOI   ScienceOn
4 Rangan, R. M., Rohde, S. M., Peak, R., Chadha, B., and Bliznakov P. (2005), Streaming Product Lifecycle Process: A Survey of Product Lifecycle Management Implementations, Directions, and Challenges, Journal of Computing and Information Science in Engineering, 5, 227-237.   DOI   ScienceOn
5 Salvendy, G. (Ed) (1991), Handbook of Industrial Engineering (2nd), Wiley Interscience publication.
6 Xu, X., Chen, J. L.-Q., and Xie, S. Q. (2006), Framework of a Product Lifecycle Costing System, Journal of Computing and Information Science in Engineering, 6, 69-77.   DOI   ScienceOn
7 Arakawa, M. and Fuyuki, M. (2006), Digital manual presentation system to analyze worker's properties in flexible assembly process, Proceedings of the 7th Asia Pacific Industrial Engineering and Management Systems Conference 2006, Bangkok, Thailand, 70-79.