1 |
Jiawei, H. (2000), Data mining : Concepts and Techniques, Academic press.
|
2 |
Kim, Y. S. and Lee, D. H. (2007), A Study on the Construction of Detail Integrated Scheduling System of Ship Building Process, Journal of the Society of Naval Architects of Korea, 44, 48-54.
DOI
|
3 |
Lee, K. K. et al. (2003), Digital Manufacturing based Modeling and Simulation of Production Process in Subassembly Lines at a Shipyard, The Korea Society for Simulation, 1, 185-192.
|
4 |
Mun, S. H., Doh, Y. C., Park, G. B., Kim, D. K., and Kim, S. H. (2006), A CAD/CAM System for Sub-Assembly Welding Robot System at Shipyards, The Korea Society of Machine Engineer, 6, 440-443.
|
5 |
Noh, H. W., Kim, K..J., Leem, R. S., and Kim, H. K. (2008), A Study on a Development of the Grinding Robot to Remove Welding-bid of Working Pieces, Journal of Ship and Ocean Technology, 136-143.
|
6 |
Stuart, R and Peter, N. (2009), Artificial Intelligence A Modern Approach, Pearson.
|
7 |
Arbib, M. A. (1995), The Handbook of Brain Theory and Neural Networks, The MIT Press.
|
8 |
Dayhoffs, J. E. (1990), Neural Network Architecture : An Introduction, New York, Van Nostrand Reinhold.
|
9 |
Hong, S. T. (2011), Efficient Job Progress Control Using Block Type Standardization Based on Neural Network Model, MS Thesis, Ajou University.
|