1 |
Saaty, T. L. (1997), A Scaling Method for Priorities in Hierarchical Structures, Journal of Mathematical Psychology, 15, 234-281.
|
2 |
Yang, Y. Q., Wang, S. Q., and Dulaimi, M. (2003), A Fuzzy Quality Function Deployment System for Buildable Design Decision-makings, Automation in construction, 12, 381-393.
DOI
ScienceOn
|
3 |
Lee, D. U. and Kim, Y. S. (2003), A Study on the Cost Risk Analysis for Construction Projects using fuzzy-AHP Method, Journal of the Architectural Institute of Korea, 19(4), 169-176.
|
4 |
Lee, H. S., Han, D. H. and Choi, Y. J. (2006), A Study on Service Quality Measurement Using Triangular Fuzzy Number(TFN) and Analytic Hierarchy Process(AHP), Journal of the Society of Korea Industrial and Systems Engineering.
|
5 |
Lee, K. H. and Oh, K, R. (1997), Fuzzy Theory and Application Volume I: Theory, Hongrung Publishing Company, Seoul, Korea.
|
6 |
Cheng, C. H. (1999), Evaluating weapon systems using ranking fuzzy numbers, Fuzzy Sets and Systems, 107, 25-35.
DOI
ScienceOn
|
7 |
Lee, S. H. and Yun, D. G. (2003), Using Fuzzy Numbers to Evaluate Service Quality(FR-SERVQUAL), Journal of the Society of Korea Industrial and Systems Engineering, 27(3), 66-74.
|
8 |
Park, C. G., Nam, J. H., Lee, Y. G., Kim, K. H., and Choi, G. R. (2007), The Consideration of Evaluator's Confidence and Risk Attitude in Fuzzy AHP, Journal of the Society of Korea Industrial and System Engineering, 30(1), 89-95.
|
9 |
Saaty, T. L. and Vargas, L. G. (2001), Model, Methods, Concepts and Application of the Analytic Hierarchy Process, Kluwer Academic Publishers, Boston
|
10 |
Choi, S. H., Kim, J. W., and Han, K. H. (2010), Development of Hybrid-AHP system and its application for both quantitative and qualitative assessment values, Journal of the Korean Operations Research and Management Science Society, 689-697.
|
11 |
Hwang, J. S. and Lee, C. S. (2004), A Risk Management Method Using Fuzzy Theory for Early Construction Stage, Journal of the Architecture and Urban Research Information Center, 5(2), 136-143.
|
12 |
Kim, S. H., Jung, B. H., and Kim, J. K. (2003), Decision Analysis and Application, Youngji Moonhwasa, Seoul, Korea.
|
13 |
Kwak, S. J., Yoo, S. J., and Heo, J. Y. (2003), Fuzzy Decision making Analysis for Public Assessment of Dam Construction, The Korea Spatial planning Review, 38, 107-121.
|
14 |
Lee, C. J., L, G., and Won, J. S. (2009), An Analysis of the BIM Software Selection Factor, Journal of the Architectural Institute of Korea, 25(7), 153-163.
|
15 |
Albright, S. C. (2007), VBA for Modelers-Developing Decision Support Systems with Microsoft Excel Second edition, Thomson Brooks/Cole.
|
16 |
Chang, D. Y. (1996), Applications of the extent analysis method in fuzzy AHP, European Journal of Operation Research, 95(3), 649-655.
DOI
ScienceOn
|