1 |
Endsley, M. R. (1995b), Measurement of situational awareness in dynamic systems, Human Factors, 37, 65-84
DOI
ScienceOn
|
2 |
Kim, S. K. (2008), Development and Evaluation of Crew Resource Management Training for Improving Team Performance of Operators in the APR-1400 Nuclear Power Plant, Graduate School of Kyung Hee University, Dissertation of Industrial Engineering
|
3 |
O'Hara, J. M. and Hall, R. E. (1990), Advanced control rooms and crew performance issues : implications for human reliability, Brookhaven National Laboratory, NewYork 11973, 1405-1409
|
4 |
Reason, J. (1987), The Chernobyl errors, Bulletin of the British Psychological Society, 40, 201-206
|
5 |
United States Congress (1982), Section 306 of the Nuclear Waste Policy Act of 1982(Public Law 97-425)
|
6 |
Gaddy, C. and Wachtel, J. (1992), Team skills training in nuclear power plant operations, in Swezey, R. and Salas, E.(Eds), Teams : Their Training and Performance, Ablex, Norwood, NJ
|
7 |
Guo, Z. and Uhrig, R. E. (1992), Nuclear power plant performance study by using neural networks, IEEE transaction on nuclear science, 39(4), 915-918
DOI
ScienceOn
|
8 |
Mumaw, R., Swatzler, D., Roth, E., and Thomas, W. (1994), Cognitive skill training for nuclear power plant operational decision making (NUREG/CR-6126), Washington, DC : U.S. Nuclear Regulatory Commission
|
9 |
Helmreich, R. L. et al. (1999), The evolution of crew resource management training in commercial aviation, The international journal of aviation psychology, 9(1), 19-32
DOI
ScienceOn
|
10 |
USNRC (1989), Operator licensing examiner standards(NUREG-1021), Washington DC : US Nuclear Regulatory Commission
|
11 |
Rasmussen, J. (1986), Information processing and human-machine interaction, Amsterdam : North Holland
|
12 |
Chidester, T. R., Helmreich, R. L., Gregorich, S. E., and Geis, C. E. (1991), Pilot personality and crew coordination : Implications for training and selection, The International Journal of Aviation Psychology, 1(1), 25-44
DOI
ScienceOn
|
13 |
Belton, S. (2001), CRM training in the nuclear industry, paper presented at the Third CRM Users Group Workshop, University of Aberdeen, October
|
14 |
Lee, D. H., Byun, S. N., and Lee, Y. H. (2007), Short-Term Human Factors Engineering Measures for Minimizing Human Error in Nuclear Power Facilities, Journal of the Ergonomics Society of Korea, 26(4), 121-125
DOI
ScienceOn
|
15 |
Roth, E. M. et al. (1994), An empirical investigation of operator performance in cognitively demanding simulated emergencies, NUREG/CR-6208. Washington, DC : USNRC
|
16 |
Helmreich, R. L. (1993), Fifteen years of the CRM wars : A report form the trenches, IN B. J. Hayward and A.R. Lowe(Eds.), Proceedings of the Australian Aviation Psychology Symposium, 73-87, Melbourne : The Australian Aviation Psychology Association
|
17 |
O’Donnell, R. D. and Eggemeier, F. T. (1986), Workload assessment methodology. In K. R. Boff, L. Kaufman, and J. Thomas, Eds., Handbook of Perception and Human Performance; volumeⅡ, cognitive Processes and Performance. New York, NY : J. Wiley and Sons
|
18 |
INPO (1993), Control Room Teamwork Development Training : Course Administration and Facilitation Guide, National Academy for Nuclear Training, Atlanta, GA
|
19 |
INSAG; International Nuclear Safety Advisory Group (1986), Summary report on the Post-Accident Review Meeting on Chernobyl Accident. Vienna, Austria : International Atomic Energy Agency
|
20 |
KOPEC (2007), Engineering Report : 2th HFE V and V Report, SNK 3 and 4, Korea Power Engineering Company
|
21 |
Sebok, A. (2000), Team performance in process control : influences of interface design and staffing levels, Ergonomics, 43(8), 1210-1236
DOI
PUBMED
ScienceOn
|
22 |
Montgomery, J. Gaddy C., and Toquam, J. (1991), Team interaction skills evaluation criteria for nuclear power plant control room operators, Proceedings of the Human Factors Society 35th Annual Meeting, 2-6 September, 918-22, Santa Monica, CA : HFS
|
23 |
Smith, P. C. and Kendall, L. M. (1963), Retranslation of expectations : An approach to the construction on unambiguous anchors for rating scales, Journal of Applied Psychology, 47, 149-155
DOI
|
24 |
Norman, D. A. and Bobrow, D. G. (1975). On data-limited and resourcelimited processes. Cognitive Psychology, 7, 44-64
DOI
|
25 |
Williges, R. and Wierwille, W. W. (1979), Behavioural measures of aircrew mental workload, Human Factors, 21, 549-574
DOI
ScienceOn
|
26 |
Coblentz, A. and Mollard, R. (1989), Human efficiency variability in monotonous conditions effects on safety, Human decision making and manual control, 76-86
|
27 |
Kirkpatrick, D. L. (1994), Evaluation training programs : The four levels, San Francisco, CA : Berrett-Koehler
|
28 |
USNRC (1980), NRC action plan developed as a result of the TMI-2 Accident (NUREG-0660), Washington DC : US Nuclear Regulatory Commission
|
29 |
USNRC, Human-System Interface and Plant Modernization Process : Technical Basis and Human Factors Review Guidance (NUREG/ CR-6637; BNL-NUREG-52567), Washington DC : US Nuclear Regulatory Commission
|
30 |
Byun, S. N. and Lee, D. H. (2001), Preliminary Safety Review on the Design of Korea Next Generation Reactor : A Human Factors Evaluation of Advanced Control Facilities in Korea Next Generation Reactor, Korea Institute of Nuclear Safety, KINS/HR-404
|
31 |
Rogovin, M., Grampton, G. T., and the Nuclear Regulatory Commission (NRC) Special Inquiry Group (1980), Three Mile Island : A report to the Commission and the public (NUREG/CR-1250, 1). Washington, DC : U.S. Nuclear Regulatory Commission
|
32 |
Wickens, C. D. (1992), Engineering Psychology and Human Performance, New
York, NY; Harper Collins
|
33 |
Wickens, C. D., Gordon, S. E., and Liu, Y. (1998), An Introduction to Human Factors Engineering, New York, NY : Longman
|
34 |
Braby, C. D., Harris., D., and Muir, H. C. (1993). A psychophysiological approach to the assessment of work underload, Ergonomics, 36, 1035-1042
DOI
ScienceOn
|