A Study on the Framework and its implementation of Toyota Production System |
Lee, Young-Hoon
(Department of Information and Industrial Engineering, Yonsei University)
Kwon, Soon-Geol (Department of Information and Industrial Engineering, Yonsei University) Lee, Hong (Department of Business Administration, Kwangwoon University) Lee, Hyun (Department of Business Administration, Kwangwoon University) Kim, Chan-Mo (POSCO Research Institute, POSRI Bldg.) |
1 | 김영환 (1994), 도요타 생산방식의 성공적 적용에 관한 사례 연구, 동아대학교 경영대학원, 석사학위논문 |
2 | Burgam, Patrick, M. (1984), JIT: On the move and Out o fthe Aisles, Manufacturing Engineering, 65-71 |
3 | Jaideep Motwani (2003), A business process change framework for examining lean manufacturing: a case study, Industrial Management & Data Systems, 103(5), 339-346 DOI ScienceOn |
4 | Monden, Yasuhiro (1981), What Makes the Toyota Production System Really Tick?, Industrial Engineering, 36-46 |
5 | Womack, J. P. (1990), The Machine that Changed the World, Macmillan Pub Co |
6 | 쿠로다 히테도시 저, 강명상, 김신인, 이경근, 주장길 역 (2005), 도요타 생산방식 전개매뉴얼, 한국표준협회미디어 |
7 | 이청호, 이경호 (2004), 도요타생산시스템의 성공적 운영을 위한 전제조건- 한, 일 자동차부품업체의 기술이전 사례를 중심으로-, 산업경제연구, 17(5), 1833-1853 |
8 | 양문희 (1991), 도요타 생산시스템에 대한 소고, 신소재 연구논집, 1, 47-65 |
9 | Adler, Paul, S. (1999), Flexibility Versus Efficiency? A Case Study of Model Changeovers in the Toyota Production System, Organization Science, 10(1), ABI/INFORM Global, 43 DOI ScienceOn |
10 | Nellemann, D. D. and Smith, L. F. (1982), Just-in-Time vs Just-In-Case Production/Inventory Systems Concepts Borrowed Back from Japan, 12(2), Second Quarter, 12-21 |
11 | Hall, Robert W. (1982), Stockless Production for the United States, APICS 25th Annual Conference Proceedings, 314-318 |
12 | 양종택 (2000), 일본형 생산시스템의 특성에 관한 연구 -도요타 생산시스템을 중심으로-, 한일정상논집, 19, 103-120 |
13 | Kelleher, James P. (1984), The Zero Inventories Concept as Applied to Job Shops, In Proceedings of Zero Inventory Philosophy and Practices Seminar, St. Louis, Missouri, 18-23 |
14 | 부민호, 박윤선(1997), 도요타 생산방식에서의 JIT적용 현황 및 신 도요타 생산방식에 관한 연구, 명지대 산업기술연구소 논문집, 16, 87-92 |
15 | 이상복, 김국, 안해일 (1990), 도요타 자동차 공장의 생산관리, 산업공학, 9(2), 2095-2104 |
16 | 송한식, 홍성찬 역 (1994), 신도요타 시스템, 기아경제연구소 |
17 | Mark, Ken(1983), New Work Methods Slash Time per Job, Plant Management and Engineering, 36-38 |
18 | 이시이 마사미쓰 저, 한유키코 역 (2005), 가장 쉬운 도요타 생산방식 입문, 동양문고 |