1 |
Arroyo, J. M. and Conejo, A. J. (2000), Optimal Response of a Thermal Unit to an Electricity Spot Market, IEEE Transactions on Power Systems, 15(3), 1098-1104
DOI
ScienceOn
|
2 |
Garcia-Gonzalez, J., Parrilla, E., and Mateo, A. (2006), Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market, European Journal of Operational Research, In Press
|
3 |
Hong, J. S. et al. (2004), A Study on Predicting Generator Composition Ratio after Electricity Industry Restructuring, IE Interfaces, 17(3), 269-281
|
4 |
Park, C. H. (2002), A Study on Fuel Distribution for Generator's Efficiency and Cost Saving, Joint Conference of KlIE/KORMS Spring 2002
|
5 |
Park, J. H. and Baek, Y. S. (2003), Development of application for unit commitment using the database, Journal of The Korea Society of Energy Engineering, 12(4), 274-280
|
6 |
Takriti, S. and Birge, J. R. (2000), Using Integer Programming to Refine Lagrangian-Based Unit Commitment Solutions, IEEE Transactions on Power Systems, 15(1), 151-156
DOI
ScienceOn
|
7 |
Yang, M. H and RIM, S. G. (2002), Short-term Forecasting of Monthly Maximum Electricity Load based on Winters Multiplicative Seasonal Model, Journal of the Korean Institute of Industrial Engineers, 28(1), 63-75
|
8 |
Song, S. H. and Lee, S. K. (2006), A Mixed Integer Linear Programming Approach for the Profit Based Unit Commitment Problem under Non-Linear Fuel Consumption Constraint and Maintenance Cost, Working Paper
|
9 |
Padhy, N. P. (2004), Unit Commitment - A Bibliographical Survey, IEEE Transactions on Power Systems, 19(2), 1196-1205
DOI
ScienceOn
|
10 |
Yamin, H. Y. (2004), Review on methods of generation scheduling in electronic power systems, Electric Power Systems Research, 69, 227-248
DOI
ScienceOn
|
11 |
Arroyo, J. M. and Conejo, A. J. (2002), Optimal Response of a Power Generaror to Energy, AGC, and Reserve Pool-Based Markets, IEEE Transactions on Power Systems, 17(2), 404-410
DOI
ScienceOn
|
12 |
Torre, S. et al. (2002), Price Maker Self-Scheduling in a Pool-based Electricity Marker: A Mixed Integer LP Approach, IEEE Transactions on Power Systems, 17(4), 1037-1042
DOI
ScienceOn
|
13 |
Kim, S. H. (1984), Application of Management Science in Electricity Industry, Applications of Management Science, 1, 17-25
|
14 |
Dang, C. and Li, M. (2006), A floating-point genetic algorithm for solving the unit commitment problem, European Journal of Operational Research, In Press
|
15 |
Ko, Y. J. et al. (2002), Generator Maintenance Scheduling for Bidding Strategies in Competitive Electricity Market, Journal of The Korea Society of Energy Engineering, 11(1), 59-66
|