1 |
Choi, W.J., Park, H.K. and Shin, H.O. (1996), Automation of the Real-Time Production Sequencing System of an Automobile Assembly Line, IE Interfaces, 9(2), 47 - 59
|
2 |
Choi, W.J. and Shin, H.O. (1997), A Real-Time Sequence Control System for The Level production of the Automobile Assembly Line, Computers and Industrial Engineering, 33(3), 769-772
DOI
ScienceOn
|
3 |
Duplaga, E.A. and Bragg, D.J. (1998), Mixed-Model Assembly Line Sequencing Heuristics for Smoothing Component Parts Usage : A Comparative Analysis, International Journal of Production Research, 36(8), 2209-2224
DOI
ScienceOn
|
4 |
King, J.R (1980), Machine-Component Group Formation in Production Flow Analysis: An Approach Using a Rank Order Clustering Algorithm, International Journal of Production Research, 18(2),213-232
DOI
ScienceOn
|
5 |
Won, Y.C, and Koh, J.M. (1997), Mixed Model Assembly Sequencing Using Neural Net, IE Interfaces, 10(2), 51-56
|
6 |
Kim, YK., Kim, J.Y and Kim, Y (2000), A Coevolutionary Algorithm for Balancing and Sequencing in Mixed Model Assembly Lines, Applied Intelligence, 13(3),247-258
DOI
ScienceOn
|
7 |
Ha, YH., Woo, S.B., Ahn, H.S., Hahn, H.S. and Park, Y.J. (2003), Implementation of a Vehicle Production Sequencing Module Using Constraint Satisfaction Technique for Vehicle production Planning system, IE Interfaces, 16(3),352-361
|
8 |
Choi, w.J. (1996), A Daily Production Sequence Planning System fat the Automobile Assembly Plant, IE Interfaces, 9(2), 61-74
|
9 |
Moon, D.H., Song, C, Kim, HS. and ,Kim, K.Y (2003), A Simulation Analysis on the Validity of Color Rescheduling Storage in an Automobile Painting Shop, IE interfaces, 16(2),211-221
|
10 |
Kim, YM and Sea, YH. (1996), Model Grouping in a Mixed Model Assembly Line, IE Interfaces, 9(2). 12-37
|
11 |
Hyun, CJ., Kim, Y.H. and Kim, YK. (1998), A Genetic Algorithm for Multiple Objective Sequencing Problems in Mixed Model Assembly Lines, Computers and Operations Research, 25(7-8),675-690
DOI
ScienceOn
|
12 |
Xiabo, Z., Zhou, Z. and Asres, A. (1999), A Note on Toyota' s Goal of Sequencing Mixed Models on an Assembly Line, Computers & Industrial Engineering, 36(1), 57-65
DOI
ScienceOn
|
13 |
Zhang, Y.H., Luh, P.B., Yoneda, K. and Kyoya, T. (2000), Mixed-Model Assembly Line Scheduling Using the Lagrangian Relaxation Technique, IIE Transactions, 32(2), 125-134
|