Implementation of a Vehicle Production Sequencing Module Using Constraint Satisfaction Technique for Vehicle Production Planning System
![]() |
Ha, Young-Hoon
(Information Systems Research Center., Informia Co. Ltd)
Woo, Sang-Bok (Information Systems Research Center., Informia Co. Ltd) Ahn, Hyun-Sik (Information Systems Research Center., Informia Co. Ltd) Hahn, Hyung-Sang (Information Systems Research Center., Informia Co. Ltd) Park, Young-Jin (Manufacturing Engineering Center, GM Daewoo Auto&Technology) |
1 | Chase, T.(1998), Centralized Vhicle Scheduler An Application of Constraint Technology, http://www.ilog.com/products/optimization/tech/research/cvs.pdf |
2 | Hwang, H., Cha C. N., Sun, J.U., Hann, K.H., Moon, S.W., Lee. S. and Hong, S.P.(1996), Development of a Computer System for the Lot-sizing and Scheduling of the Side Frame Press Shop, IE Interface, 9(2), pp.3-17 |
3 | Noh, S.D. and Kim, D.Y.(2002), virtual Manufacturing for an Automotive Company(III)-Construction and Operation of a Virtual Paint Shop, IE Interface, 15(4), pp356-363 |
4 | Bergen, M. E., Beek, P. V. and Carchrae, T(2001), Constraint-based Vehicle Assembly Line Sequencing, Lecture Notes in Computer Science, 2056, pp.88-99 |
5 | Choi, W. J., Park, H. K. and Shin, H. O .(1996), Automation of Real-time Production Sequencing System of an Automobile Assembly Line, IE Interface, 9(2), pp.47-59 |
6 | ILOG Press Releaser(1997), ILOG drives productivity improvements at Chrysler, www.ilog.com/success/chryslcr/index.cfm |
7 | Kim, Y. M and Seo, Y.h.(1996) Grouping in a Mixed-model Assembly Line, IE Interface, 9(2), pp.39-45 |
8 | Warwick, T. and Tsang, E. P. K.(1995), Tackling Car Sequencing Problems Using a Generic Genetic Algorithm Strategy, Evolutionary Computation, 3(3), pp. 267-298 |
9 | Borrertt, J.E. and Tang, E.P.K.(2001), A Context for Constraint Satisfaction Problem Formulation Selection, Constraints. 6(4), pp.299-327 |
10 | Kim, K. D., Woo, S. B., and Hahn, H. S.(2001), A Study on the Erection Scheduling for Shipbuilding Considering Resource Constraints , IE Interface, 14(3), pp.218-226 |
11 | Park, H. K., Choi, W.J. and Shin, H. O.(1996), Automation of Color Selection System in the Automobile Painting Shop, IE Interface, 9(2), pp.19-37. |
12 | Choi, W. J.(1996), A Dilly Production Sequencing system for the automobile assembly Plant, IE Interface, 9(2), pp.61-74 |
![]() |