1 |
Degarmo, E. Paul,J. T. Black and Ronald A. Kohser,(1997), Materials and Processes in Manufacturing, 8th ed., Prentice-Hall, Inc
|
2 |
Shingo and Shigeo, (1989), A Study of the Toyota Production Systems, 141-166, Productivity Press
|
3 |
Chase, Richard B. and Nicholas J. Aquilano.,(1995), Seventh Edition, Production and Operations Management: Manufacturing and Services. Irwin
|
4 |
Scholl, A. und R. Klein, (1999): ULINO: Optimally Balancing U-Shaped JIT Assembly Lines, International Journal of Production Research, 37(4), 721- 736
|
5 |
Black,J. T.,(1991), The Design of the Factory with a future, 64-80 McGraw-Hill, Inc
|
6 |
Urban and J. T.,(1998), Note. Optimal Balancing of U-Shaped Assembly Lines, Management Science, 44(5), 738-741
|
7 |
Dixon,D. & D.Scott, (1995), Designing a cellular fabrication plant, The Fabricator
|
8 |
Redford, A. and Chal,J.,(1994), Design for Assembly, 75-134, McGraw-Hill, Inc
|
9 |
Miltenburg, J. and J. Wijngaard, (1994), The U-Lne Balancing Problem, Management Science, 40(10),1378-1388
|