Browse > Article
http://dx.doi.org/10.7232/JKIIE.2017.43.1.012

A Study on a Smart Factory Layout Design Based on TOC-DBR  

Kim, Byung-Joo (Department of Industrial and Systems Engineering, Gyeongsang National University and Korea Aerospace Industry)
Kim, Deok Hyun (Korea Aerospace Industry)
Lee, In Su (Korea Aerospace Industry)
Jun, Cha-Soo (Department of Industrial and Systems Engineering & Engineering Research Institute, Gyeongsang National University)
Publication Information
Journal of Korean Institute of Industrial Engineers / v.43, no.1, 2017 , pp. 12-18 More about this Journal
Abstract
This study presents a plant concept design for a smart factory which is mainly targeted to machine airplane parts. The plant layout is based on the TOC-DBR approach together with autonomous distributed factory control considered, while discrete event simulation is also performed in order to validate its layout. The resulting layout and its procedure turn out to be quite a useful guideline in realizing those smart factories especially for machining-oriented manufacturing industries.
Keywords
TOC(theory of constraints); DBR(drum buffer rope); Smart Factory; Plant Layout Design; Job Shop; Discrete Event Simulation;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Altiok, T. (1983), The Allocation of Interstage Buffer Capacities in Production Lines, IIE Transactions, 15(4), 292-299.   DOI
2 Bae, S. Y. (2006), The Information of Dispatching Rules for Improving Job Shop Performance, Journal of the Society of Korea Industrial and Systems Engineering, 29(4), 107-112.
3 Baker, K. R. (1974), Introduction to Sequencing and Scheduling, John Wiley & Sons Inc., New York, 2-8.
4 Choi, K. S. (2001), Password TOC for Corporate, HanEon Community.
5 Chung, N. K. (2002), TOC Constraint management, HanEon Community.
6 KEPD (2014), KEIT PD The present condition and the outlook of Smart Factory, PD ISSUE REPORT OCTOBER 2014, 14(10), 53-72.
7 Koh, H. G. (2001), On the Size of the Constraint Buffer in the TOC (Theroy of Constraints).
8 Koh, H. G. and Yoon, H. Y. (2002), On the Size of the Constraint Buffer in The TOC(Theory of Constraints), IE interfaces, 14(4), 248-265.
9 Lee, K. S. (2002), The Study for Protective Capacity and Time Buffer of DBR, 2002 Fall Conference Proceeding of the JKIIE, 248-265.
10 Nam, S. H., Lee, J. Y., Yun, J. S., Kim, B. H., and Kim, C. H. (2014), Korea Evaluation Institute of Industrial Technology, The domestic and overseas status and prospect of the smart factory, 14(10), 54-72.
11 NIA (2014), Industry 4.0 & Creative Economy Strategies of Manufacture Industry, IT & Future Strategy Report.
12 Park, Y. H. (2002), Multi-Factor Analysis of Firm-Level Performance Through Feed-Forward, Feed-Back Relationships, The Korea Society For Simulation, 11(1), 59-70.
13 Park, J. W. (2016), Policy and business case of government about Smart factory, Industrial Engineering Magazine, 23(1), 13-17.
14 Yim. J. I. and Kim, Y. W. (2015), Functional Model for Smart Factory, 2015 Summer Conference Proceeding of the KICS, 208-209.