1 |
Manitz, M. (2008), Queueing-model based analysis of assembly lines with finite buffers and general service times, Computers and Operational Research, 35, 2520-2536.
DOI
|
2 |
Moon, D. H., Sung, J. H., and Cho, H. I. (2003), A Case Study on the Verification of the Initial Layout of Engine Block Machining Line Using Simulation, Journal of Korea Society for Simulation, 12(3), 41-53.
과학기술학회마을
|
3 |
Papadopoulos, H. T. and Heavey, C. (1996), Queueing theory in manufacturing systems analysis and design : A classification of models for production and transfer lines, European Journal of Operational Research, 92(1), 1-27.
DOI
|
4 |
Powell, S. G. and Pyke, D. F. (1994), An empirical investigation of the number two-moment approximation for production lines, International Journal of Production Research, 32, 1137-1157.
DOI
|
5 |
Tempelmeier, H. and Burger, M. (2001), Performance evaluation of unbalanced flow lines with general distributed processing times failures and imperfect production, IIE Transactions, 33, 293-302.
|
6 |
Tempelmeier, H. (2003), Practical considerations in the optimization of flow production systems, International Journal of Production Research, 41(1), 149-170.
DOI
|
7 |
Tijms, H. (1994), Stochastic Models, An Algorithmic Approach, John Wiley and Sons, New York.
|
8 |
Whitt, W. (1982), Approximating a point process by a renewal process, I : two basic methods, Operations Research, 30, 125-147.
DOI
|
9 |
Xu, T., Moon, D. H., Shin, Y. W., and Jung, J. Y. (2010), An Effect Analysis of Layout Concepts on the Performances in Manufacturing Lines for Automotive Engine, Journal of Korea Society for Simulation, 19(2), 107-118.
과학기술학회마을
|
10 |
Choi, S. D., Kumar, A. R., and Houshyar, A. (2002), A simulation study of an automotive foundry plant manufacturing engine blocks, Proceedings of the 2002 Winter Simulation Conference, San Diego, 1035-1040.
|
11 |
Gershwin, S. B. (1994), Manufacturing systems engineering, Prentice Hall, Englewood Cliffs, N. J.
|
12 |
Govil, A. K. and Fu, M. C. (1999), Queueing theory in manufacturing : A survey, Journal of Manufacturing Systems, 18(3), 214-240.
DOI
|
13 |
Gross, D. and Harris, C. M. (1985), Fundamentals of queueing theory, 2nd ed., John Wiley and Sons, New York.
|
14 |
Helber, S. (1998), Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times, European Journal of Operations Research, 109, 24-42.
DOI
|
15 |
Jayaraman, A. and Agarwal A. (1996), Simulating an engine plant, Manufacturing Engineering, 117(5), 60-68.
|
16 |
Johnson, M. A. and Taafe, M. R. (1989), Matching moments to phase distributions : mixture of Erlang distributions of common order, Stochastic Models, 5, 711 -743.
DOI
|
17 |
Lau, H. S. and Martin, G. E. (1987), The effects of skewness an kurtousis of processing times in unpaced lines, International Journal of Production Research, 25, 1483-1492.
DOI
|
18 |
Levantesi, R., Matta, A., and Tolio, T. (2003), Performance evaluation of continuous production lines having different processing times and multiple failure modes, Performance Evaluation, 51, 247-268.
DOI
|
19 |
Magazine, M. J. and Stecke, K. E. (1996), Throughput for production lines with serial work stations and parallel service facilities, Performance Evaluation, 25, 211-232.
DOI
|