1 |
Jaraiedi, M., Kochhar, D. V., and Jaisingh, S. C. (1987), Multiple Inspections to Meet Desired Outgoing Quality, Journal of Quality Technology, 19(1), 46-51
|
2 |
Avinadav, T. and Raz, T. (2003), Economic optimization in a fixed sequence of unreliable inspections, Journal of Operational Research Society, 54, 605-613
DOI
ScienceOn
|
3 |
Raz, T. and Thomas, M. U. (1982), A Method for Sequencing Inspection Activities Subject to Errors, IIE Transactions, 15(1), 12-18
DOI
ScienceOn
|
4 |
Yang, M. H. (2007), A Design and Case Study of a K-Stage BLU Inspection System for Achieving a Target Defective Rate, International Journal of Management Science, 13(2), 141-157
ScienceOn
|