1 |
Boctor, F. F. and Poulin, P. (2005), Heuristics for the N-product, M-stage, economic lot sizing and scheduling problem with dynamic demand, International Journal of Production Research, 43(10),2809-2828
DOI
ScienceOn
|
2 |
Drexl, A. and Haase, K. (1995), Proportional lotsizing and scheduling, International Journal of Production Economics, 40(1),73-87
DOI
ScienceOn
|
3 |
Drexl, A. and Haase, K. (1996), Sequential-analysis based randomized-regret-methods for lot- sizing and scheduling, Journal of the Operational Research Society, 47(2), 251-265
DOI
ScienceOn
|
4 |
Gupta, D. and Magnusson, T. (2005), The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times, Computers & Operations Research, 32(4), 727-747
DOI
ScienceOn
|
5 |
Marinelli, F., Nenni, M. E. and Sforza, A. (2007), Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company, Annals of Operations Research, 150(1),177-192
DOI
ScienceOn
|
6 |
Silva, C. and Magalhaes, J. M. (2006), Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry, Computers and Industrial Engineering, 50(1),76-89
DOI
ScienceOn
|
7 |
Fleischmann, B. and Meyr, H. (1997), The general lotsizing and scheduling problem, OR Spektrum, 19, 11-21
DOI
|
8 |
Pattloch, M., Schmidt, G. and Kovalyov, M. Y. (2001), Heuristic algorithms for lotsize scheduling with application in the tobacco industry, Computers and Industrial Engineering, 39(3), 235-253
DOI
ScienceOn
|
9 |
Porkka, P., Vepsalainen, A. P. and Kuula, M. (2003), Multiperiod production planning carrying over set-up time, International Journal of Production Research, 41(6), 1133-1148
DOI
ScienceOn
|
10 |
Sox, C. R. and Gao, Y. (1999), The capacitated lot sizing problem with setup carry-over, lIE Transactions, 31(2), 173-181
|
11 |
Suerie, C. (2006), Modeling of period overlapping setup times, European Journal of Operational Research, 174(2), 874-886
DOI
ScienceOn
|
12 |
Clark, A. R. and Clark, S. J. (2000), Rolling-horizon lot-sizing when set-up times are sequence-dependent, International Journal of Production Research, 38(10),2287-2307
DOI
ScienceOn
|
13 |
Suerie, C. and Stadtler, H. (2003), The capacitated lot-sizing problem with linked lot sizes, Management Science, 49(8), 1039-1054
DOI
ScienceOn
|
14 |
Meyr, H. (2000), Simultaneous lotsizing and scheduling by combining local search with dual reoptimization, European Journal of Operational Research, 120(2), 311-326
DOI
ScienceOn
|
15 |
Meyr, H. (2002), Simultaneous lotsizing and scheduling on parallel machines, European Journal of Operational Research, 139(2), 277-292
DOI
ScienceOn
|
16 |
Zanoni, S. and Zavanella, L. (2005), Model and analysis of integrated production-inventory system: The case of steel production, International Journal of Production Economics, 93(94), 197-205
DOI
ScienceOn
|
17 |
Gopalakrishnan, M. (2000), A modified framework for modeling set-up carryover in the capacitated lotsizing problem, International Journal of Production Research, 38(14), 3421-3424
DOI
ScienceOn
|
18 |
Staggemeier, A. T. and Clark, A. R. (2001), A survey of lot-sizing and scheduling models, 23rd Annual Symposium of the Brazilian Operational Research Society, 938-947
|