1 |
Burstein, M. C., Nevision, C. H., and Carlson, R. C. (1984), Dynamic Lot-Sizing When Demand Timing Is Uncertain, Operations Research, 32, 362-379
DOI
ScienceOn
|
2 |
Sox, C. R. (1997), Dynamic Lot Sizing with Random Demand and Non-Stationary Costs, Operations Research Letters, 20, 155-164
DOI
ScienceOn
|
3 |
Wagner, H. M. and Whitin, T. M. (1958), Dynamic Version of the Economic Lot Size Model, Management Science, 5(1), 89-96
DOI
ScienceOn
|
4 |
Zangwill, W. I. (1969), A Backlogging Model and a Multi-Echelon Model of a Dynamic Lot Size Production System - A Network Approach, Management Science, 15(9),506-527
DOI
ScienceOn
|
5 |
Askin, R. G. (1981), A Procedure for Production Lot Sizing with Probabilistic Dynamic Demand, AIlE Transactions, 13, 132-137
DOI
ScienceOn
|
6 |
Lambert, A. M., and Luss, H. (1982), Production Planning with Time-Dependent Capacity Bounds, European Journal of Operations Research, 9(4), 275-280
DOI
ScienceOn
|
7 |
Kim, C. H. and Lee, W. S. (2001), A Single Facility Multi-Product Dynamic Lot Sizing Problem with Random Demand, J. of the Korean Society of Maintenance Engineers, 6(2), 127-137
|
8 |
Nevison, C. H. (1985), A Cost Adjustment Heuristic for Dynamic Lot-Sizing with Uncertain Demand Timing, Operations Research, 33,1342-1352
DOI
ScienceOn
|
9 |
Florian, M. and Klein, M. (1971), Deterministic Production Planning With Concave Costs and Capacity Constraints, Management Science, 18(1), 12-20
DOI
ScienceOn
|
10 |
Vargas, V. A. (1995), The Stochastic Version of the Dynamic Production Lot-Size Model, Working Paper, Goizueta Business School, Emory University
|
11 |
Lee, W. S., Kim, B. N., and Yang, J. Y. (2000), Setup Cost Stability Region for a Single-Facility Multi-Product Dynamic Lot-Sizing Model, J. of the Korean Society of Maintenance Engineers, 5(2), 51-66
|
12 |
Baker, K. R., Dixon, P., Magazine, M.J.,and Silver, E. A. (1978), An Algorithm fot the Dynamic Lot-Size Problem With Time-Varying Production Capacity Constraints, Management Science, 26(16), 1710-1720
|
13 |
Sung, C. S. (1985), A Production Planning Model for Multi-Product Facilities, Journal ofthe Operations Research Society of Japan, 28(4), 345-358
DOI
|
14 |
Love, S. F. (1973), Bounded Production and Inventory Models With Piecewise Concave Costs, Management Science, 20(3), 313-318
DOI
ScienceOn
|
15 |
Silver, E. (1978), Inventory Control under a Probabilistic TimeVarying, Demand Pattern, AIlE Transactions, 10, 371-379
DOI
ScienceOn
|
16 |
Lee, W. S., and Joo, C. M. (2000), Setup Cost Reduction in a Multi-Product Dynamic Lot-Sizing Model, IE Interfaces, 13(2), 217-224
|
17 |
Bookbinder, J. H. and Tan, J. Y. (1988), Strategies for the Probabilistic Lot-Sizing Problem withService-Level Constraints, Management Science, 34, 1096-1108
DOI
ScienceOn
|