1 |
Lee, H. L. and Rosenblatt, M. J.(1987), Simultaneous Determination of Production Cycle and Inspection Schedules In a Production System, Management Science, 33(9), 1125-1136
DOI
ScienceOn
|
2 |
Lee, H. L. and Rosenblatt, M. J.(1989), A Production and Maintenance Planning Model with Restoration Cost Dependent on DetectionDelay, lIE Transactions, 21(4), 368-375
|
3 |
Rahim,M. A.(1994),Joint Determination of Production Quantity, Inspection Schedule, andControl ChartDesign, lIE Transactions, 26(6), 2-11
|
4 |
Rosenblatt, M. J. and Lee, H. L.(1986), Economic Production Cycles with ImperfectProduction Processes, lIE Transactions, 18(1),48-55
|
5 |
Kim, C. H. and Hong, Y.(1999), An Optimal Production Run Length in Deteriorating Production Processes, International Journal of Production Economics, 58, 183-189
DOI
ScienceOn
|
6 |
Hax, A. C. and Candea, D.(1984), Production and Inventory Management, Prentice-Hall, Inc.,New Jersey
|
7 |
Porteus, E. L.(1986), Optimal Lot Sizing, Process Quality Improvement and SetupCost Reduction, Operations Research, 34(1),137-144
DOI
ScienceOn
|
8 |
Zhang,X. and Gerchak,Y.(1990), Joint Lot Sizing and Inspection Policy in an EOQ Modelwith Random Yield, lIE Transactions, 22(1),41-47
|
9 |
Yano, C. A. and Lee, H. L.(1995), Lot Sizing with Random Yields: A Review, Operations Research, 43(2),311-334
DOI
ScienceOn
|
10 |
Salameh, M. K. and Jaber, M. Y.(2000), Economic Production Quantity Modelfor Items with Imperfect Quality, International Journal of Production Economics, 64, 59-64
DOI
ScienceOn
|
11 |
Jamal, A. M. M., Sarker, B. R., and Mondal S.(2004), Optimal Manufacturing Batch Size with Rework Process at a SingleStageProduction System, Computers &Industrial Engineering, 47(1),77-89
DOI
ScienceOn
|
12 |
Silver, E. A. and Peterson, R.(1985), Decision Systems for Inventory Management and Production Planning, Wiley, New York
|