1 |
Glassey,C. R. and Wang, W. W. (1991), Dynamic Batching Heuristic for Simultaneous Processing, IEEE Transactions on Semiconductor manufacturing, 4(2), 77-82
|
2 |
Kim, C. and Tanchoco, J. M. A. (1994), Bidirectional automated guided vehicle system. Material Flow Systems in Manufacturing, Chap.9
|
3 |
Kobza, J. E., Shen, Y-C. and Reasor, R. J. (1998), A stochastic model of empty-vehicle traveI time and load request service time in light-traffic material handling systems. IIE Transactions, 30, 133-142
|
4 |
Koo, P. and Jang, J. (2002), Vehicle Travel Time Models for AGV Systems under Various Dispatching Rules, International Journal of Flexible Manufacturing Systems, 14(3), 249-261
DOI
ScienceOn
|
5 |
Koo, P. and Jang, J. (2001), Vehicle Travel Time Analysis in Automated Guided Vehicle Systems, Journal of the Korean Operations Research and Management Science Society,26(3), 97-108
|
6 |
Koulamas, C. P. and Smith, M. L. (1988), Look-Ahead Scheduling for Minimizing Machine lnterference,International Journal of Production Research, 26(9), 1523-1533
DOI
ScienceOn
|
7 |
Krishnamurthy, N. N., Batta, R. B. and Karwan, M. H. (1993), Developing conflict-free routes for automated guided vehicles, Operations Research, 41(6), 1077-1090
DOI
ScienceOn
|
8 |
Smith, T. M. and Stecke, K. E. (1996), on the Robustness of Using Balanced Part Mix Ratios to Determine Cycle Part Input Sequences into Flexible Flow Systems,International Journal of Production Research, 34(10), 2925-2942
|
9 |
Ulusoy, G. and Bilge, U. (1993), Simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Research, 31(12), 2857-2873
DOI
ScienceOn
|
10 |
Vepsalainen, A. P. J. and Morton, T. E. (1987), Priority Rules for Job Shops with Weighted Tardiness Costs, Management Science, 33(8), 1035-1047
DOI
ScienceOn
|
11 |
Smith, T. and Sarin, S. (1992), Program for dispatching and routing AGVs, Computers & Industrial Engineering, 23, 187-190
|
12 |
Engell,S., Kuhn,T. and Moser,M. (1990), On Decentralized On-line Scheduling of FMS, Proceedings of the 29th IEEE Conference on Decision and Control, Part 1, Honolulu, Hawaii, 125-127
|
13 |
Oboth, C., Batta, R. and Karwan, M. (1999), Dynamic conflict-free routing of automated guided vehicles. International Journal of Production Research, 37, 2003-2030
|
14 |
Maxwell, W. L. and Muckstad, J. A. (1982), Design of AGV systems,IIE Transactions, 14(2), 114-124
|
15 |
Mahadevan, B. and Narendran, T. T. (1990), Design of an AGV-based material handling system for a flexible manufacturing system, International Journal of Production Research, 28(9), 1611-1622
DOI
|
16 |
Zeestraten,M. J. (1990), The Look Ahead Dispatching Procedure, International Journal of Production Research, 28(2), 369-384
DOI
|
17 |
Jang, J., Suh,J., and Ferreira,P. (2001), An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines, International Journal of Production Research, 39(17), 3901 - 3921
DOI
ScienceOn
|
18 |
Krishnamurthy, N. N., Batta, R. B. and Karwan, M. H. (1993), Developing conflict-free routes for automated guided vehicles, Operations Research, 41(6), 1077-1090
DOI
ScienceOn
|
19 |
Chand, S., Traub, R. and Uzsoy, R. (1997), Rolling Horizon Procedures for the Single Machine Deterministic Total Completion Time Scheduling Problem with Release Dates, Annals of Operations Research, 70, 115-125
|
20 |
Lee,H. (1998), Queuing Theory,Sigma Press, Seoul
|
21 |
Jang, J., Suh, J., and Liu, C. R. (2001), A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System, International Journal of Flexible Manufacturing Systems, 13(3), 287-308
DOI
ScienceOn
|
22 |
Taghaboni-Dutta, F. and Tanchoco J. M. A. (1995), Comparison of dynamic routing techniques for automated guided vehicle system, International Journal of Production Research, 33(10), 2653-2669
DOI
ScienceOn
|
23 |
Lin,J. T. and Dgen P.-K. (1994), An algorithm for routeing control of a tandem automated guided vehicle system, lnternational Journal of Production Research, 32(12), 2735-2750
DOI
ScienceOn
|
24 |
Rajotia,S. K., Shanker and Batra, J. L. (1998), Determination of optimal AGV fleet size for an FMS, lnternational Journal of Production Research, 36(5), 1177-1198
DOI
ScienceOn
|
25 |
Suh, J., and Jang, J. (2000), A Look-Ahead Control Procedure for Automatic Guided Vehicles in a Clean Bay, Proceedings of the International Conference on Production Research, August 2-4, Bangkok,Thailand
|