1 |
Kowalski, P.J., Spencer, P.J. and Neuschutz, D., 1995: 3 Phase diagram, SLAG ATLAS, 2nd Ed, Verein Deutscher Eisenhuttenleute(VDEh), p. 95, Velag Stahleisen GmbH, D-Dusseldorf, Germany.
|
2 |
Kopyto, M. et al, 2009: THERMODYNAMIC PROPERTIES OF AND PbO- LIQUID SOLUTIONS, Archives of Metallurgy and Materials, 54(3), pp. 811- 822.
|
3 |
John L. Bray, 1963: "Chapter 14 Lead ", Non-Ferrous Production Metallurgy 2nd Ed., p. 329, John Wiley & Sons. Inc., New York, USA.
|
4 |
Azakami, T. and Awakura, Y., 1999: Extractive Metallurgy, The Japan Inst. Metal, Sendai, Japan, pp. 94-98.
|
5 |
Kim, Se-Jong, Son, In-Joon and Sohn, Ho-Sang, 2012: The Selective Removal of Sb and Pb from Molten Bi-Pb-Sb Alloy by Oxidation, J. Korean Inst. Resources Recycling, 21(4), pp.53-59.
|
6 |
Fruehan, R. J., 1971: Mass Spectrometric Determination of Activities for Alloys with Complex Vapor Species: Bi-Pb and Bi-Tl, Metall. Trans., 2(4), pp.1213-1218.
DOI
|
7 |
Yoon, S.W. and Lee, H. M., 1998: A Thermodynamic Study of Phase Equilibria in the Sn-Bi-Pb Solder System, Calphad, 22(2), pp. 167-178.
DOI
|
8 |
Kim, Byung-Su, Lee, Jae-chun and Jeong, Jin-ki, 2009: Current Status on the Pyrometallurgical Process for Recovering Precious and Valuable Metals from Waste Electrical and Electronic Equipment(WEEE) Scrap, J. Korean Inst. Resources Recycling, 18(4), pp. 14-23.
|
9 |
Shin, Dong-Yeop, et al., 2008: Pyro-metallurgical Treatment of Used OA Parts for the Recovery of Valuable Metals, J. Korean Inst. Resources Recycling, 17(2), pp.46-54.
|
10 |
Oh, Jae-Hyun, et al., 2012: Technological Modules for the Recycling of Urban Mines and Non-Ferrous Smelting Process in Korea, J. Korean Inst. Resources Recycling, 21(1), pp. 3-16.
|
11 |
Tamura, Y. and Minani, Y., 1993: Lead Smelting in Takehara Refinery, Shigen-to-Sosai, 109(12), pp. 1029- 1032.
DOI
|