A study on the quantitative risk grade assessment of initial mass production for weapon systems |
Jung, Yeongtak
(Defence Agency for Technology and Quality)
Ham, Younghoon (Defence Agency for Technology and Quality) Roh, Taegoo (Defence Agency for Technology and Quality) Ahn, Manki (Defence Agency for Technology and Quality) Ko, Kyungwa (Hanwha-systems) |
1 | Ahn, N.M. 2015. "Suggestion for Enhancement of Product Examination Government Quality Assurance Activity." J Korean Soc Qual Manag 43(3):327-340. DOI |
2 | Beak, Y.G., Kang, B.S., and Jo, K.J. 2015. "An Objective method of risk assessment based on RAM analysis for warship." J Korean Soc Qual Manag 43(4):273-288. DOI |
3 | DAPA Instruction. 2014. MRA Instruction. 218. |
4 | Defense Agency for Technology and Quality(DTAQ). 2017. Defense Quality Management Regulations. |
5 | Department of defense. Defense Acquisition University. 2003. Risk Management guide for DOD Acquisition. Fifth Edition(ver 2.0). |
6 | Ebeling, C. E. 1997. "An Introduction to Reliability and Maintainability Engineering." McGraw-Hill Companies, Inc., Boston. |
7 | Emre, Celebi., Hassan, A., Kingravi Patricio A. Vela. 2013. "A comparative study of efficient initialization methods for the k-means clustering algorithm." Expert Systems with Applications 40(2013):200-210. DOI |
8 | Erioli, Andrea 2005. "K-means Cluster Analysis and Mahalanobis Metrics: a problematic match or an overlooked opportunity." Statistica Applicata 17:61-73. |
9 | Finkelstein, Maxim, 2008. Introduction Failure Rate Modelling for Reliability and Risk. Springer Series in Reliability Engineering, 1-84. |
10 | ISO 31000. 2018. Risk Management Principles and Guidelines. |
11 | Kim, Y.S., and Choi, H.S. 2010. "Introduction to Defense Quality Management." Hyungseul: 101-116. |
12 | Lee, C.H., and Yang, K.W. 2014. "A Study on the Risk Identification Methods for Initial and Mass Production Stage of Military Products Using FMEA." J Korean Soc Qual Manag 42(3):311-324. DOI |
13 | Lee, G.H. 1997. "A Study on Clustering Methods." Mokpho University:10-23. |
14 | Lee, J. H., Jung, Y. T. 2017. "A Study on the Methodology of Manufacturing Readiness Levels(MRLs) 8 of Manufacturing Readiness Assessment(MRA)." J Korea Academia-Industrial cooperation Society 18(6):609-619. DOI |
15 | Seo, M.K., Yun, W. Y. 2017. "Clustering-based Monitoring and Fault detection in Hot Strip Roughing Mill." J Korean Soc Qual Manag. 45(1):25-38. DOI |
16 | Seo, M.Y., Yun, W.Y. 2017. "Clustering-based Monitoring and Fault detection in Hot Strip Roughing Mill." J Korean Soc Qual Manag 45(1):025-038. DOI |
17 | Shin, S.S., and Lee, K.S., Cho, H.G. 2013. "An Objective Method of Risk Assessment Based on Stochastic Modelling." J Korean Soc Qual Manag 41(3):465-474. DOI |
18 | U.S. Department of Defense. 1998. MIL-HDBK-338B. Reliability Modeling and Prediction : Electronic Reliability Design Handbook. |
19 | Yoo, H.S., Kim. H.W., Sakong, C.D. 2017. "RAM analysis Report on ADC2A". ADD, ADC2A-RAMR V5.0. |
20 | Yoon, J.B., Ryu, S.H. 2016. "A Study on systematic performance of risk identification, risk assessment and risk treatment." DTAQ Technical Report:12-26. |
21 | MIL-STD-882D. 2000. Risk Management Guide for DoD Acquisition. |