Browse > Article
http://dx.doi.org/10.7469/JKSQM.2012.40.1.025

Corrective Action Strategy based on SWOT Analysis in Service FMEA  

Sutrisno, Agung (Department of Mechanical Engineering, Sam Ratulangi University)
Kwon, Hyuck-Moo (Department of Systems Management and Engineering, Pukyong National University)
Publication Information
Abstract
Service FMEA may yield several possible corrective actions for each failure mode with large RPN. Corrective actions for each service failure are usually interrelated with the customers and environmental elements of the service system. SWOT analysis can provide an effective way to analyze the inner and outer environmental impacts for each corrective action. In this paper, we suggest a way for selecting and ranking corrective strategy in service operation based on SWOT analysis. Every candidate of corrective action strategy is ranked and evaluated on the basis of the impact factors of the SWOT variables, correlations between possible corrective actions and SWOT variables, and RPNs of service failures. The most desirable set of corrective actions is selected considering the preference score of each corrective action, required resources and budgetary allowance. The proposed methodology is demonstrated with an illustrative example.
Keywords
Service FMEA; RPN; SWOT Analysis; Impact Factor; Correlation; Preference Score;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Asadi, R. and Daryaei, M.(2011), "Prioritization of forms of tourism in Iran to formulate national strategies," European Journal of Scientific Research, Vol. 65, No.1, pp. 144-152.
2 al-Rousan, M. and Qawasmeh, F.(2009), "The Impact of SWOT Analysis on achieving a competitive advantage: evidence from Jordanian banking industry," International Bulletin of Business Administration, Iss. 6, pp. 82-92.
3 Bluvband, Z., Grabov, P. and Nakar, O.(2004), "Expanded fmea (efmea)," Proceedings of Annual Symposium on Reliability and Maintainability, pp. 31-36.
4 Carmignani, G.(2009), "An integrated structural framework to cost-based FMECA: The priority-cost FMECA," Reliability Engineering & System Safety, Vol. 94, Iss. 4, pp. 861-871.   DOI
5 Chuang, P. T.(2007), "Combining service blueprint and fmea for service design," The Service Industries Journal, Vol. 27, Iss. 2, pp. 91-104.   DOI
6 Einarsson, S. and Rausand, M.(1998), "An approach to vulnerability analysis of complex industrial systems," Risk Analysis, Vol.18, Iss.5, pp.535-546.   DOI
7 Flouris, T. and Yilmaz, A.K.(2010), "The risk management framework to strategic human resource management," International Research Journal of Finance and Economics, Iss. 36, pp. 25-45.
8 Foong, L. M.(2007), Understanding of SWOT analysis [online]. Available online from http/ article.tqmcasestudies.com/free-tqm-ebook/swot-analysis.pdf. [Access on 29 November 2011].
9 Ghazinoory, S., Abdi, M. and Mehr, M. A.(2011), "SWOT methodology: a state-of-the-art review for the past, a framework for the future," Journal of Business Economics and Management, Vol. 12, Iss. 1, pp. 24-48.   DOI
10 Stamatis, D.H.(1995), Failure mode and effect analysis, ASQ Quality Press, Milwaukee.
11 Helms, M. M. and Nixon, J.(2010), "Exploring SWOT analysis-where are we now?: A review of academic research from the last decade," Journal of Strategy and Management, Vol. 3, No. 3, pp. 215-251.   DOI
12 Hunger, J.D. and Wheelen, T.L.(2002), Essentials of Strategic Management: 3rd edition. Prentice Hall, New Jersey.
13 Kim, S.Y., Yun, W.Y. and Kim, H.G.(2007), " Reestablishment of RPN evaluation method in FMEA procedure for motor in household appliances," Journal of Korean Society for Quality Management, Vol. 35, No. 1, pp. 1-9.
14 Krishna, A., Dangayach G.S. and Jain, R.(2011), "Service recovery: Literature review and research issues," Journal of Service Science Research, Vol. 3, No. 1, pp. 71-121.
15 Laaksolahti, A.(2005), Measuring organizational capabilities in the engineering and consulting industry, Thesis(M.Sc), Lappeenranta University of Technology, Finland.
16 Lee, C.T.(2010), "Selecting technologies for constantly changing applications markets," Research-Technology Management, Vol. 53, No.1, pp. 44-54.
17 Seyedhoseini, S.M. and Hatefi, M.A.(2009), "Two - pillar risk management (tprm): a generic project risk management process," Scientia Iranica Transaction E: Industrial Engineering, Vol. 16, No. 2, pp. 138-148.
18 Mann, R. and Kehoe, D.(1994). "An evaluation of the effects of quality improvement activities on business performance," International Journal of Quality and Reliability Management, Vol. 11, Iss. 4, pp. 29-44.   DOI
19 Mbachu, J. and Frei, M.(2011), "Diagnosing the strategic health of an organization from SWOT analysis results: case study of the Australian cost management profession," Construction Management and Economics, Vol. 29, Iss. 3, pp. 287-303.   DOI
20 Patel, S. and Zaveri, J.(2010), "A risk-assessment model for cyber attacks on information systems," Journal of Computers, Vol. 5, No. 3, pp. 352-359.
21 Seyedhoseini, S.M., Noori, S. and Hatefi, M.A. (2009), "An integrated methodology for assessment and selection of the project risk response actions," Risk Analysis, Vol. 29, Iss. 5, pp. 752-763.   DOI
22 Trzcielinski, S. and Trzcielinska, J.(2011), "Some elements of the theory of opportunities," Human Factors and Ergonomics in Manufacturing & Service Industries, Vol. 21, Iss.2, pp. 124-131.   DOI
23 Thawesaengskulthai, N. and Tannock, J.D.T.(2008), "A decision aid for selecting improvement methodologies," International Journal of Production Research, Vol. 46, No. 23, pp. 6271-6237.
24 Wheelen, T.L. and Hunger, J. D.(2008), Concepts in strategic management and business policy: eleventh edition. Pearson Prentice Hall, New Jersey.
25 Xing, K. and Xian J.(2010), "Empirical research on enterprise organizational capability evaluation system based on AHP," Proceedings of International Conference Future Information Technology and Management Engineering(FITME), pp. 256-260.
26 Yin, R.K.(1994), Case study research: design and methods- 2nd edition, Sage Publisher. London.
27 Yadav, O.P. and Singh N.(2008), "Perspectives and challenges for product reliability assurance in the product development process," International Journal of Product Development, Vol. 5, No. 1/2, pp. 4-16.   DOI   ScienceOn