1 |
Apostolakis, G. and Moieni, P.(1987) "The Found ations of Models of Dependence in PSA," Reliability Engineering, Vol. 18, pp.177-195.
DOI
ScienceOn
|
2 |
Picard, Lowe and Garrik(1983), Preliminary Review of the Ringhals 2 Probabilistic Safety Study, Swedish Nuclear Power Inspectorate.
|
3 |
Vaurio, J.K.(1999), "Common-Cause Failure Model, Data, Quantification," IEEE Tran, Reliability, Vol. 48 No.3, pp. 213-214.
DOI
ScienceOn
|
4 |
Vaurio, J.K.(1999), "Common-Cause Failure Model, Data, Quantification," IEEE Tran, Reliability, Vol. 48 No.3, pp. 213-214.
DOI
ScienceOn
|
5 |
Moody, J.H. and Follen, S.M.(1985), "Common Cause Modeling of Reactor Trip Breaker Configuration," ANS/ENS Int'l Topical Meeting on Probabilistic Safety Methods and Applications, Vol.3.
|
6 |
Mosleh, A. and Siu, N.O.(1987), "A Multi-Parameter, Event-Based Common-Cause Failure Model," Proc. of the 9th Int'l Conference on Structural Mech anics in Reactor Technology
|
7 |
Mosleh, A.(1989), Procedures for Treating Common Cause Failures in Safety and Reliability Studies, Procedural Framework and Examples, NUREG /CR-4780, EPRI NP-5613, Vol. 1, Vol.2
|
8 |
Dempster, A. P., Laird, N. M., and Rubin, D. B.(1977) "Maximum likelihood from incomplete data via the EM algorithm," Journal of Royal Statistical Society, Series B, Vol. 39, pp.1-22.
|
9 |
Fleming, K. N.(1975), "A Reliability Model for Com mon Mode Failures in Redundant Safety Systems," Proceeding of the 6-th Annual Pittsburgh Conference on Modeling and Simulation, General Atomic Report GA-A13284, pp. 23-25.
|
10 |
Garrick(1983), Seabrook Station Probabilistic Safety Study, PL&G, PLG-0300, Public Service Co. of New Hampshire and Yankee Atomic Electric Company.
|
11 |
Edison(1981), Zion Probabilistic Safety Study.
|
12 |
Evans, M.G., Parry, G.W. and Wreathall, J.(1983), "On The Treatment of Common Cause Failures in Systems Analysis," Reliability Engineering, Vol. 9, No.2, pp. 125-136.
|
13 |
백장현, 서재영, 나만균(2005), "2단계 EM 알고리즘을 이용한 공통원인 고장 분석", 한국경영과학회지, 30 권 2호, pp. 63-71.
|