1 |
Amin, R. W. and Letsinger W. C.(1991), "Improved switching rules in control procedures using variable sampling intervals", Commun Stat Simul Comput, Vol. 20, pp. 205-230.
DOI
ScienceOn
|
2 |
Champ, C. W. and Woodall, W. H.(1987), "Exact Results for Shewhart Control Charts With Supplementary Runs Rules", Technometrics, Vol.29, No.4, pp. 393-399.
DOI
ScienceOn
|
3 |
Duncan, A. J.(1956), "The Economic Design of X Charts Used to Maintain Current Control of a Process", Journal of the American Statistical Association, 51(274), pp. 228-242.
DOI
ScienceOn
|
4 |
Tagaras, G.(1998), "A Survey of Recent Developments in the Design of Adaptive Control Charts" ournal of Quality Technology, Vol. 30, No. 3, pp. 212-231.
|
5 |
Khoo, M. B. C. and Ariffin, K. N. (2006), "Two Improved Runs rules for the Shewhart Control Chart", Jounal of Quality Technology, Vol.32, pp. 427-431.
|
6 |
Costa, A. F. B.(1997), "X Charts with Variable Sample Size and Sampling Intervals", Journal of Quality Technology, Vol. 29, No. 2, pp. 197-204.
|
7 |
Das T. K., Jain, V., and Gosavi, A.(1997), "Economic Design of Dual-Sampling-Interval Policies for X Charts with and without Run Rules", IIE. Transactions, Vol. 29, pp. 497-506.
|
8 |
Costa, A. F. B.(1994), "X Charts with Variable Sample Size", Journal of Quality Technology, Vol. 26, No.3, pp.155-163.
|
9 |
Acosta-Mejia, C. A.(2007), "Two Sets to Runs Rules for the Chart", Quality Engineering, Vol.19, pp. 129-136.
DOI
|
10 |
Reynolds, M. R., Amin, R. W., Arnold, J. C., and Nachlas, J. A.(1988), "X Charts with Variable Sampling Intervals", Technometrics, Vol. 30, No. 2, pp. 181-192.
DOI
ScienceOn
|
11 |
Prabhu, S. S., Montgomery, D. C., and Runger, G. C.(1997), "Economic- Statistical Design of Adaptive X Chart", International Journal of Production Economics, Vol. 49, No. 1, pp. 1-15.
DOI
ScienceOn
|
12 |
Montgomery, D. C.(2001), Introduction to Statistical Quality Control(4th ed.), New York, NY: Wiley.
|
13 |
Prabhu, S. S., Runger, G. C., and Keats, J. B.(1993), "X Chart with Adaptive Sample Sizes", International Journal of Production Research, Vol. 31, pp. 2895-2909.
DOI
ScienceOn
|
14 |
Prabhu, S. S., Montgomery, D. C., and Runger, G. C.(1994), "A Combined Adaptive Sample Size and Sampling Interval X Control Chart Scheme", Journal of Quality Technology, Vol. 26, No. 3, pp.164-176.
|
15 |
Page, E. S.(1962) "A modified control chart with warning lines", Biometrika, Vol. 49, pp. 171-176.
DOI
|
16 |
Parkhideh, S. and Parkhideh, B.(1996), "The economic design of a flexible zone chart with AT&T rules", IIE Trans. Vol. 28, Np. 3, pp. 261-266.
DOI
|
17 |
Parkhideh, S. and Parkhideh, B.(1998), "Design of a flexible zone individuals control chart.", Jour. Prod, Econ, Vol. 36, No. 8, pp. 2259-2267.
|
18 |
Kim, Y. B., Hong, J. S., and Lie, C. H.(2009), "Economic statistical design of 2-of-2 and 2-of-3 runs rule scheme", Quality and Reliability Engineering International, Vol. 25, pp. 215-228.
DOI
ScienceOn
|
19 |
Klein, M.(2000), "Two alternatives to the Shewhart X control chart", Journal of Quality Technology, Vol. 32, pp. 427-431.
|
20 |
Lorenzen, T. J. and Vance, L. C.(1986), "The Economic Design of Control Charts: A Unified Approach", Technometrics, Vol. 28, No. 3, pp. 3-10.
DOI
|