1 |
임태진(2008), '적응형 관리도의 설계에 대한 비교 연구', '품질경영학회지' 36권 1호, pp.7-19
PUBMED
|
2 |
Prabhu, S.S., Montgomery, D.C., and Runger, G.C.(1994), 'A Combined Adaptive Sample Size and Sampling Interval X Control Scheme', Journal of Quality Technology, Vol.26, No.3, pp.164-176
DOI
|
3 |
Wade, M.R. and Woodall, W.H.(1993), 'A Review and Analysis of Cause-Selecting Control Charts', Journal of Quality Technology, Vol.25, No.3, pp.161-169
DOI
|
4 |
Woodall, W.H.(1986), 'Weaknesses of the Econornic Design of Control Charts', Technometrics, Vol. 28, No. 4, pp.408-409
DOI
ScienceOn
|
5 |
Zhang, G.X.(1984), 'A New Type of Control Charts and a Theory of Diagnosis with Control Charts', World Quality Congress Transaction, American Society for Quality Control, pp.175-185
|
6 |
Prabhu, S.S., Montgomery, D.C., and Runger, G.C.(1997), 'Economic-Statistical Design of Adaptive X Chart', Intemational Journal of Production Economics, Vol. 49, No. 1, pp.1-15
DOI
ScienceOn
|
7 |
Costa, A.F.B.(1997), 'X Charts with Variable Sample Size and Sampling Intervals', Journal of Quality Technology, Vol. 29, No. 2, pp.197-204
DOI
|
8 |
Yang, S. and Su, H.(2007), 'Adaptive control schemes for two dependent process steps' , Journal of Loss Prevention in the Process Industries, Vol. 20, pp.15-25
DOI
ScienceOn
|
9 |
Lee, H.J., Lim, T.J., and Jang, S.C(2007), 'VSSI X Control Charts for Processes With Multiple Assignable Causes', Proceedings of the 2007 lEEE lEEM, pp.1241-1245
|
10 |
Lorenzen, T.J. and Vance, L.C.(1986), 'The Economic Design of Control Charts: A Unified Approach', Technometrics, Vol. 28, No. 3, pp. 3-10
DOI
|
11 |
Duncan, A.J. (1956), 'Economic Design of X Charts Used to Maintain Current Control of a Process', Journal of the American Statistical Association, Vol. 51(274), pp.228-242
DOI
ScienceOn
|