Browse > Article

Statistical design of Shewhart control chart with runs rules  

Kim, Young-Bok (Dept. of Industrial Engineering, Seoul National University)
Hong, Jung-Sik (Dept. of Industrial & Information Systems Engineering, Seoul National University of Technology)
Lie, Chang-Hoon (Dept. of Industrial Engineering, Seoul National University)
Publication Information
Abstract
This research proposes a design method based on the statistical characteristics of the Shewhart control chart incorporated with 2 of 2 and 2 of 3 runs rules respectively. A Markov chain approach is employed in order to calculate the in-control and out-of-control average run lengths(ARL). Two different control limit coefficients for the Shewhart scheme and the runs rule scheme are derived simultaneously to minimize the out-of-control average run length subject to the reasonable in-control average run length. Numerical examples show that the statistical performance of the hybrid control scheme are superior to that of the original Shewhart control chart.
Keywords
Shewhart control chart; 2 of 2 runs rule; 2 of 3 runs rule; ARL;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 박창순, 이재헌, 김영일(2002), 'VSI와 VSS 관리도의 경제적 효율 비교',품질경영학회지, 30권, 2호, pp. 99-117   PUBMED
2 Acosta-Mejia, C. A.(2007), 'Two Sets to Runs Rules for the X Chart', Quality Engineering, Vol.19, pp.129-136   DOI   ScienceOn
3 Chung, K. J.(1992), 'Determination of Optimal Design Parameters of an X Control Chart', Journal of Operational Research Society, Vol.43, No.12, pp.1151-1157   DOI
4 Costa, A. F. B. and Magalhaes M. S. De. (2005), 'Economic design of two-stage charts: The Markov chain approach', International Journal of Production Economics, Vol.95, No.1, pp.9-20   DOI   ScienceOn
5 Klein, M. (2000), 'Two Alternatives to the Shewhart X Control Chart', Journal of Quality Technology, Vol.32, pp.427-431   DOI
6 송서일, 박현규, 정혜진(2004), 'VSI EWMA 관리도의 경제적 통계적 설계',품질경영학회지, 32권, 1호, pp. 92-101   PUBMED
7 Bai, D. S. and Lee, K. T.(1998), 'An Economic Design of Variable Sampling Interval X Control Charts', International Journal of Production Economics, Vol.54, pp.57-64   DOI   ScienceOn
8 임태진(2005), '선택적 누적합(S-CUSUM) 관리도', 품질경영학회지, 33권, 3호, pp. 126-134   과학기술학회마을   PUBMED
9 Chen, Y. K., Hsieh, K. L. and Chang, C. C.(2007), 'Economic Design of the VSSI X Control Charts for Correlated Data', International Journal of Production Economics, Vol.107, No.2, pp.528-539   DOI   ScienceOn
10 Woodall, W. H.(1985), 'The statistical design of quality control charts', The Statistician, Vol.34, pp.155-160   DOI   ScienceOn
11 Fu, J. C., Shmueli, G. and Chang, Y. M. (2003), 'A unified Markov chain approach for computing the run length distribution in control charts with simple or compound rules', Statistics & Probability Letters, Vol.65, pp.457-466   DOI   ScienceOn
12 Brook, D. and Evans D. A.(1972), 'An approach to the Probability Distribution of CUSUM Run Lengths', Biometrika, Vol.59, pp.539-549   DOI   ScienceOn
13 Champ, C. W. and Woodall, W. H.(1987), 'Exact Results for Shewhart Control Charts With Supplementary Runs Rules', Technometrics, Vol.29, No.4, pp.393-399   DOI
14 Fu, J. C., Spiring, F. A. and Xie, H. (2002), 'On the average run lengths of quality control schemes using a Markov chain approach', Statistics & Probability Letters, Vol.56, pp.369-380   DOI   ScienceOn
15 Taylor, H. M. (1968), 'The Economic Design of Cumulative Sum Control Charts, Technometrics', 10(3), 479-488   DOI
16 Prabhu, S. S., Montgomery, D. C. and Runger, G. C.(1997), 'Economic-Statistical Design of an Adaptive X Chart', International Journal of Production Economics, Vol.49, pp.1-15   DOI   ScienceOn
17 이호중, 임태진(2005), '두 개의 이상원인을 고려한 VSSI X 관리도의 경제적-통계적 설계',대한산업공학회지, 31권, 1호, pp. 87-98
18 Hurwitz A. and Mathur M.(1992), 'A very Simple Set of Process Control Rules', Quality Engineering, Vol. 5, No. 1, pp. 21-29   DOI
19 Khoo, M. B. C. and Ariffin, K. N. bt. (2006), 'Two Improved Runs rules for the Shewhart X Control Chart', Quality Engineering, Vol.18, pp.173-178   DOI   ScienceOn