1 |
Box, G. E. P., Coleman, D. E., and Baxley, R., Jr. (1997), 'A Comparison of Statistical Process Control and Engineering Process Control,' Journal of Quality Technology, Vol. 29, No. 2, pp. 128-130
|
2 |
Jiang, W., Tsui, K-L, and Woodall,W. H. (2000), A New SPCMonitoring Method: The ARMAChart, Technometrics, Vol. 42, No. 4,399-410
DOI
ScienceOn
|
3 |
Box, G. E. P. and Kramer, T.(1992), 'Statistical Process Monitoringand Feedback Adjustment-A Discussion,' Technometrics, Vol. 34,pp. 251-285
DOI
ScienceOn
|
4 |
Zhang, N. F. (1998), A StatisticalControl Chart for Stationary ProcessData, Technometrics, Vol. 40, No. 1,24-38
DOI
ScienceOn
|
5 |
Box, G. E. P., Jenkins, G. M., andReinsel, G. C. (1994), Time SeriesAnalysis, Forecasting, and Control, 3rded., Prentice Hall, Englewood Cliffs,NJ
|
6 |
Bruce, A. G. and Martin, R. D.(1989), 'Leave-k-Out Diagnostic forTime Series (with Discussion),' Journalof the Royal Statistical Society, SeriesB, Vol. 51, pp. 363-424
|
7 |
Cho, SinsuP, Ryu, Gui Yeol, Park, B.U., and Lee, J. J. (1993), 'OutlierDetection Diagnostic based onInterpolation Method in AutoregressiveModels' Journal of the Korean Statistical Society. Vol. 22, No. 2, 283-306
|
8 |
Crowder, S. V., Hawkins, D. M.,Reynold M. R. JR., and Yashchin, E(1997), 'Process Control andStatistical Inference', Journal of Quality Technology, Vol. 29, No. 2,pp. 134-139
|
9 |
Chen, C. and Liu, L.-M. (1993),'Forecasting Time Series withOutliers', Journal of Forecasting, Vol.12, pp. 12-35
|
10 |
Tucker, W. T., Faltin, F. W., andVander Wiel, S. A. (1993), 'Algorithmic Statistical Process Control: AnElaboration,' Technometrics, Vol. 35,pp. 363-375
DOI
ScienceOn
|
11 |
Tsay, R. S. (1986), 'Time SeriesModel Specification in the Presence ofOutliers,' Journal of Amencan Statistical Association, Vol. 81, pp.131-141
|
12 |
Ledolter, J. (1989), 'The Effect ofAdditive Outliers on the Forecastsfrom ARIMA models' International Journal of Forecasting, Vol. 5, pp.231-240
DOI
ScienceOn
|
13 |
Box, G. E. P. and Lucceno, A.(1997). Statistical Control : By Monitoring and Feedback Adjustment,John wiley & Sons, New York
|
14 |
Lee, Jae June (1994), 'Detection ofLocal Structural Changes in TimeSeries,' The Korean Journal of Applied Statistics, Vol. 7, No. 2, pp.299-311
|
15 |
Alwan, L. C. and Roberts, H. V.(1988), 'Time-Series Modeling forStatistical Process Control', Journal of Business & Economic Statistics, Vol.6, No.1, pp. 87-95
DOI
ScienceOn
|
16 |
Atienza, O. O., Tang, L. C., andAng, B. W. (1998), 'A SPCProcedure for Detecting Level Shiftsof Autocorrelated Processes', Journalof Quality Technology, Vol. 30, No. 4,pp. 340-351
|
17 |
Baxley, R.V., Jr.(1994), 'Applicationof the EWMA for AlgorithmicStatistical Process Control,' Quality Engineering, Vol. 7, pp. 397-418
DOI
ScienceOn
|