1 |
Lloyd, D.K. and Lipow, M. (1962),Reliability: Management Methods andMathematics, Prentics-Hall, EnglewoodCliffs, NJ, pp. 330-347
|
2 |
Pollock, S.M. (1968), 'A BayesianReliability Growth Model,' IEEETransactions on Reliability, VolumeR-17, Number 4, pp. 187-198
DOI
ScienceOn
|
3 |
Smith, A.F.M. (1977), 'A BayesianNote on Reliability Growth During aDevelopment Testing Program,' IEEETransactions on Reliability, VollumeR-26, Number 5, pp. 346-347
DOI
ScienceOn
|
4 |
Littlewood, B. and J.L.Verrall, (1973)'A Bayesian Reliability Growth Modelfor Computer Software,' Record IEEESymposium on Computer SoftwareReliability, IEEE, New York, pp.70-77
|
5 |
Littlewood, B. (1981) 'A Critique ofthe Jelinski-Moranda Model forSoftware Reliability,' Proceedings,Annual Reliability and Maintainability Symposium, pp. 357-36
|
6 |
Ascher, H. and H. Feingold, (1984),Repairable Systems Reliability, MarcelDekker, New York
|
7 |
Gross, AJ. and Kamins, M. (1968),'Reliability Assessment in the Presenceof Reliability Growth,' ProceedingsAnnual Symposium on Reliability, pp.406-416
|
8 |
Rosner, N. (1961), 'System AnalysisNon-Linear Estimation Techniques,'Proceedings,Symposium on Reliability and QualityControl, Institute of Radio Engineers,pp. 203-207
|
9 |
Crow, L.H. (1983), 'Reliability GrowthProjection from Delayed Fixes,'Proceedings, Annual Reliability andMaintainability Symposium, pp. 84-89
|
10 |
Crow, L.H. (1974), 'Reliability Analysisfor Complex Repairable Systems,'Reliability and Biometry, S1AM,Philadelphia, PA, pp. 379-410
|
11 |
Littlewood, B. (1981), 'StochasticReliability Growth: A Model for FaultRemoval in Computer Programs andHardware Designs,' IEEE Transactionson Reliability, Volume R-30, Octoberpp. 313-320
DOI
ScienceOn
|
12 |
Duane, J. T. (1964), 'Leaming CurveApproach to Reliability Monitohng,'IEEE Transactions on Aerospace,Volume 2, Number 2, PP. 563-566
DOI
ScienceOn
|
13 |
Jelinski, Z. and P.B. Moranda (1972)'Software Reliability Research,'Statistical Computer PerformanceEvaluation W. Freiberger(ed.), NewYork, Academic Press, pp. 465-484
|
14 |
Crow, L.H. (1975), 'On TrackingReliability Growth,' Proceedings,Annual Reliability and MaintainabilitySymposium, pp. 438-443
|
15 |
Wolman, W. (1963), IUroblems in SystemReliability Analysis, Marvin Zelen(ed.),Statistical Theory in Reliability,University of Wisconsin Press, Madison,Wisconsin, pp. 149-166
|
16 |
Barlow, Richard B. and Emest M.Scheuer. (1966), 'Reliability GrowthDuring a Development TestingProgram,' Technometrics, Volume 8,pp. 53-60
DOI
ScienceOn
|
17 |
Cox, D.R. and P.A. Lewis (1966), TheStatistical Analysis of Series of Events, Methuen, London
|