Browse > Article

An Economic Design of the EWMA Control Charts with Variable Sampling Interval  

송서일 (동아대학교 산업 시스템공학과)
정혜진 (동아대학교 산업 시스템공학과)
Publication Information
Abstract
Traditional SPC techniques are looking out variation of process by fixed sampling interval and fixed sample size about every hour, the process of in-control or out-of-control couldn't be detected actually when the sample points are plotted near control limits, and it takes no notice of expense concerned with such sample points. In this paper, to overcome that, consider VSI(variable sampling interval) EWMA control charts which VSI method is applied. The VSI control charts use a short sampling internal if previous sample points are plotted near control limits, then the process has high probability of out-of-control. But it uses a long sampling interval if they are plotted near centerline of the control chart, since process has high possibility of in-control. And then a comparison and analysis between FSI(fixed sampling interval) and VSI EWMA in the statistical aspect and economic aspect is studied. Finally, we show that VSI EWMA control chart is more efficient than FSI EWMA control chart in the both aspects.
Keywords
VSI 관리도;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Duncan, A. J. (1971) 'The Economic Design of X-Charts When There is a Multiplicity of Assignable Causes', Journal of the American Statistical Association, Vol. 66, No. 33, pp. 107-121   DOI   ScienceOn
2 Costa, A. F. B, ' X Chart with Variable Smaple Size and Sampling Intervals,' Journal of Quality Technology. Vol. 29 No. 7, pp. 401-407 (1997)
3 Crowder, S. V, 'Computation of ARL for Combined Individual Measurement and Moving Range Chart,' JournaI of Quality Tecbnology. 29, pp. 401-407 (1987)
4 Reynold, M. R. and Amin, R. W. et at, 'CUSUM Charts with Vanable Sampling Intervals,' Technometrics, 32, 4, pp. 371-384 (1990)   DOI   ScienceOn
5 Cui R. and Reynolds. M. R. Jr, ' X Chart With Runs Rules and Vahable Sampling Intervals,' Technical Report 88-1, Virginia Polytechnic Institute and State University, Dept. of Statistics (1988)
6 Reynolds, M. R. and Amin, R. W. and Amold, J. C, and Nachlas, J. A. ' X Charts with Vahable Sampling Interval,' Technometrics. Vol. 30, No. 2, pp. 181-191 (1988)   DOI   ScienceOn
7 Costa, A. F. B, ' X Charts with Vahable Sample Size,' Journal of Quality Technology. Vol 26, No. 3, pp. 401-407 (1994)
8 Lorenzen, J. M. and Vance, L. C, 'The Economic Design of Control Charts : A Unified Approach,' Technometrics 28, pp. 3-10 (1986)   DOI   ScienceOn
9 Montgomery, D. C, 'Stadstically Constrained Economic Design of the EWMA Control Chart,' Journal of Quality Technology. Vol 27, No. 3 pp. 250-256 (1995)   DOI
10 Prabhu, S. S. and Montgomery, D. C. et al, 'Economic-Statistical Design of and Adaptive X Charts,' International JournaI of Production Economics, Vol. 49, pp. 1-15 (1997)   DOI   ScienceOn
11 Park, C. and Reynolds, M. R, ' Economic Design of a Vahable Sample Size X Chart,' Communication in Statistics- Simulatio and Computation, Vol. 23, No. 2, pp. 467-483 (1994)   DOI   ScienceOn
12 Prabhu, S. S. and Montgomery, D. C, 'A Combined Adaptive Sample Size and Sampling Interval X Control Scheme,' Journal of Quality Technology. 26, pp. 164-176 (1994)   DOI