1 |
Korea National Statistical Office, http://www.kostat.go.kr, 2016.05.09.
|
2 |
e-Index, http://www.index.go.kr, 2016.05.09.
|
3 |
Wattleworth J. A. (1965), Peak-Period Analysis and Control of a Freeway system.
|
4 |
Jacobson, L., Jason S. and Lisa N. (2006), "Ramp Management and Control Handbook," FHWA-HOP-06-001.
|
5 |
Wattleworth J. A. and Berry D. S. (1965), "Peak-period control of a freeway system-some theoretical investigations," Highway Res. Rec. 89, pp.1-25.
|
6 |
Messer C. J. (1969), "A design and synthesis of a multilevel freeway control system and a study of its associated operational control plan," Ph. D dissertation, Texas A&M university, College station.
|
7 |
Zhang L. and Levison D. (2004), "Optimal freeway ramp control without origindestination information," Transportation Research Part B 38, pp.869-887.
DOI
|
8 |
Korea Traffic Monitoring System, http://www.road.re.kr, 2016.05.09.
|
9 |
Geoffrey E. Havers, Wisconsin Department of Transportation Model Calibration, http://www.wisdot.info/microsimulation/index.php?title=Model_Calibration, 2016.05.09.
|
10 |
Kwon Y. (2011), "A Study on RMS Operating Guidelines-with a Focus on Seoul Ring Expressway," Korean society of transportation paper, vol. 31, no. 5D, pp.649-656.
|