Evaluation for the Introduction Impact of an Integrated Railway Wireless Network : A Case Study of the Wonju-Gangneung Rail Line  

Cho, Hanbyeog (Electrics and Telecommunications Research Institute)
Jang, Jeong Ah (Ajou University)
Jo, Chang-hee (Ajou University)
Yun, Hak-Sun (Korea Rail Network Authority)
Publication Information
The Journal of The Korea Institute of Intelligent Transport Systems / v.15, no.4, 2016 , pp. 129-142 More about this Journal
Abstract
This study performs an evaluation, using the economic feasibility analysis method, of the LTE based railway wireless networks (LTE-R) service that is planned to be used for the future railway networks in Korea. Its objectives are using the evaluation results and working to reflect the factors that lead to a maximization of benefits in designing an integrated railway wireless network. This study analyzes the impact of implementing an LTE-R on the railway networks, in contrast to the existing wireless network methods, e.g. VHR and TRS to new rail lines on an economic view. This results found that the benefit cost ratio is greater than 1.0 with a 10% contribution to benefits of the wireless network service in the case study on the Wonju-Gangneung rail line that will start operations in 2018; as a result, an ICT design is desired. For the introduction of an LTE-R service for the Wonju-Gangneung rail line, design specifications need to increase to benefits for each service, which will verify actual contributions and therefore result in an overall economic effect.
Keywords
Railway Wireless Network; LTE-R; Economic Effect; BCR(Benefit Cost Ratio); Economic Analysis;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Huawei LTE for Rail Technical White Paper, 2014, HUAWEI TECHNOLOGIES CO., LTD.
2 Alain BERTOUT Alcatel-Lucent, Next Generation of Railways and Metros wireless communication systems, IRSE ASPECT 2012.
3 http://www.samsungsds-nss.com/?pLTER_Solution.
4 https://www.alcatel-lucent.com/railways.
5 KTCS LTE-R Research, http://ktcs.kr.or.kr.
6 Korea Development Institute(2013), Study for Preliminary Feasibility Study Standard Guidelines of Informitization Projects (Second Edition).
7 Korea Development Institute(2006), 2006 Preliminary Feasibility Study Report, Railway Wireless Network Construction (Informatization) Project.
8 Korea Development Institute(2009), 2009 Preliminary Feasibility Study Report, Construction of the Integrated Command Wireless Communication Network Project.
9 Korea Information Society Development Institute(2012), National Railway Wireless Network Construction Plan and Impact Analysis, Ministry of Land, Transport and Maritime Affairs.
10 Korea Development Institute(2014), 2014 Preliminary Feasibility Study Report, PSLTE Construction Project.
11 Huh J. H.(2014), "Current Situation and Plan for PS-LTE," TTA Journal, vol. 156, pp.12-20.
12 Ministry of Public Safety and Security(2015), Public Hearing Data for the PS-LTE Construction Project.
13 Kim S. H.(2015), PS-LTE Feasibility Study and Industrial Development Plan, [PS-LTE Forum] PS-LTE Workshop Presentation(2015.03.11.).
14 Kim S. H.(2015), "A Brief Study on the Main Issues in Constructing PS-LTE," Korea Information Society Development Institute, vol. 27, no. 17, p.608.
15 TTAI.KO-06.0407, LTE-based Railway Communication System Requirements (Commercial and High-Speed Railway). December 16, 2015.
16 http://www.railsafety.or.kr.