1 |
ROK Government, The 3rd aviation industry development Basic plan ('21~'30), Feb 2021.
|
2 |
ROK Government, Military Aircraft Airworthiness Certification Act, 1 Aug 2009.
|
3 |
EASA, "Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Commission Implementing Regulation", Article 11, pp. 4-6, 2020.
|
4 |
US, "Assessing the Risks of Integrating Unmanned Aircraft Systems into the National Airspace System", A Consensus Study Report of the National Academies of SCENCES, Committee on Assessing the Risks of UAS Integration Aeronautics and Space Engineering Board, pp. 15-16, 2018.
|
5 |
EASA, "Policy Statement Airworthiness Certification of Unmanned Aircraft System", Doc E.Y013-01, Aug 2009. p.13.
|
6 |
DAPA, "Military Aircraft Flight Safety Certification Regulation", DAPA Instruction, Number 619, Aug 2020.
|
7 |
F. Nikodem, J. S. Dittrich and A. Bierig, "The New SORA Approach for UAS Regulation Compared to Common Civil Aviation Risk", Institute of Flight Systems, pp. 4-6, Sep 2018.
|
8 |
JARUS, "JARUS Guidelines on SORA", JAR-DEL-WG6-D.04, Jan 2019.
|
9 |
DOD, "System Safety", MIL-STD-882E, May 2012.
|
10 |
EU, "On the Rules and Procedures for the Operation of Unmanned Aircraft", Commission Implementing Regulation 2019/947, pp.49-50, May 2019.
|
11 |
Christoph Besmer, "The Skies are Open in Switzerland", 「COMMERCIAL UAV NEWS」, https://www.commercialuavnews.com/reports/europe/the-skies-are-open-in-switzerland
|
12 |
T. Kwon, S. Jeon, "A Study on SORA Methodology for Risk Assessment of UAS Operations", KSAS 2020 Fall Conference, Jeju, Nov 2020.
|
13 |
JARUS, "JARUS Guidelines on SORA Executive Summary", JAR-DEL-WG6-D.04, pp. 2-3, Jan 2019.
|