No-Failure Accelerated Life Test of Flap Actuating System using Weibull Distribution |
Cho, Hyunjun
(Aerospace R&D Center, Hanwha Corporation)
Lee, Inho (Aerospace R&D Center, Hanwha Corporation) Kim, Sangbeom (Aerospace R&D Center, Hanwha Corporation) Park, Sangjoon (Aerospace R&D Center, Hanwha Corporation) Yang, Myungseok (Agency for Defense Development) |
1 | KATS, "Reliability Terms Handbook", pp. 43-101, Korean Agency for Technology and Standards, Seoul, 2003. |
2 | R. B. Abernethy, "The New Weibull Handbook", 5th Ed., Mohmehr, 2006. |
3 | Y. Kwon, "The Effect of Shape Parameters in Designing Reliability Qualification Test for Weibull lifetime distribution", Journal of Applied Reliability, Vol. 11, No. 3, pp. 225-234, 2011. |
4 | G. Lee, H. Kim, and B. Kang, "Development of accelerated life test method for mechanical components using Weibull-IPL(Inverse Power Law) model", Proc. of the KSME Spring Conference 2003, pp. 445-450, 2003. |
5 | S. Lee and H. Kim, "No-Failure Test Times of Hydraulic System Components for the Life Test", Proc. of the KSME Fall Conference 2006, pp. 7-12, 2006. |
6 | D. Kim and Y. Kang, "Case Study of Accelerated Life Test Method for Agricultural Tractor Transmission", Journal of Biosystems Engineering, Vol. 34, No. 5 pp. 325-330, Oct. 2009. DOI |
7 | D. Kim and H. Kim, "Accelerated Life Test for Fluid Power Components", Journal of the Korea Fluid Power Systems Society, Vol. 7, No. 1 pp. 9-15, Mar. 2010. |
8 | Y. Kim, S. Kim, H. Kim, and H. Mok, "Accelerated Life Test of In-Wheel Motor for Mobile Robot", Proc. of the Korean Institute of Power Electronics Annual Conference 2009, pp. 498-505, 2009. |
9 | B. Yi, S. Yoo, and W. Lee, "Accelerated Life Test and Safety Assessment of Airbone Starter-Generator", KARI, Aerospace Engineering and Technology, Vol. 6, No. 2, pp. 229-235, Nov. 2007. |
10 | M. Shin, S. Wei, and H. Kim, "Comparison to Automobile Pilot Lamp by Accelerated Life Test", Journal of Applied Reliability, Vol. 8, No. 2, pp. 75-85, June 2008. |
11 | H. Cha, Y. Park, J. Kim, Y. Son, S. Chang, and K. Kwack, "Mechanical Lifetime Estimation of A Relay using Accelerated Life Testing", Proc. of the KSME Fall Conference 2007, pp. 1-6, 2007. |
12 | K. Lee and W. Yun, "Accelerated Life Test Design for Vacuum Cleaner Motors", Journal of Applied Reliability, Vol. 9, No. 1, pp. 47-58, Mar. 2009. |
13 | J. Jo, N. Mun, K. Lee, I. Han, J. Kim, and H. Kim, "Estimation of Exhaust Pipe Lifetime Through Accelerated Life Test", Pro. of the KSAE Annual Conference 2012, pp. 753-758, 2012. |
14 | M. Kim, Y. Park, J. Lee, and J. Park, "Fatigue Life Estimation for Flaperon Joint of Tilt-Rotor UAV", Journal of Aerospace System Engineering, Vol. 3, No. 2, pp. 12-19, June 2009. |
15 | W. Sim, E. Park, K. Kim, Y. Kim, S. Park, and J. Roh, Journal of Aerospace System Engineering, "Design of flap devices driven by SMA spring actuators", Vol. 4, No. 4, pp. 11-17, Dec. 2010. |
16 | H. Cho, H. Kim, S. Kim, S. Park, and M. Yang, "No-Failure Accelerated Life Test Time for Airborne Drive System", Proc. of the SASE Fall Conference 2015, pp. 304-309, 2015. |
17 | H. P. Bloch and F. K. Geitner, "An Introduction to Machinery Reliability Assessment", 2nd Ed., Motor City Books, 1994. |
18 | H. P. Bloch and F. K. Geitner, "Practical Machinery Management for Process Plants Volume2: Machinery Failure Analysis and Troubleshooting", 2nd Ed., Gulf Publishing Corp, 1994. |
19 | International Organization for Standardization, "Calculation of Load Capacity of Spur and Helical Gears - Part 6: Calculation of service life under variable load", ISO/DIS 6336-6. 2004. |
20 | Defense Acquisition Program Administration, "무기체계 시험평가 실무 가이드북", Publication registration number: 11-1690000-001479-01, 2013. |