1 |
D. Mercurio, Discrete Dynamic Event Tree Modeling and Analysis of Nuclear Power Plant Crews for Safety Assessment, DISS. ETH NO. 19321, 2011.
|
2 |
K.J. Kvarfordt, S.T. Wood, C.L. Smith, Systems Analysis Programs for Hands-On Integrated Reliability Evaluations (SAPHIRE) Data Loading Manual, 2008. INL/EXT-05-00643, Rev. 1.
|
3 |
M. Drouin, G. Parry, J. Lehner, G. Martinez-Guridi, J. LaChance, T. Wheeler, Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decision Making vol. 1, 2009. NUREG-1855.
|
4 |
A.L. Camp, et al., Light Water Reactor Hydrogen Manual, Sandia National Laboratories, August 1983. NUREG/CR-2726, SAND82-1137.
|
5 |
D. Mercurio, K.C. Wagner, M.T. Leonard, Y.Y. Bayraktarli, Low power shutdown level 2 probabilistic risk assessment methodology for boiling water reactors, in: ANS PSA 2013 International Topical Meeting on Probabilistic Safety Assessment and Analysis Columbia, SC, September 22-26, 2013, on CD-ROM, American Nuclear Society, LaGrange Park, IL, 2013.
|
6 |
D. Mercurio, V. Andersen, K.C. Wagner, Decommissioning level 2 probabilistic risk assessment methodology for boiling water reactors, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), 2-7 October, Sheraton Grande Walkerhill, Seoul, Korea, 2016. www.psam13.org.
|
7 |
N.E. Todreas, M.S. Kazimi, Nuclear Systems: Vol. I, Thermal Hydraulic Fundamentals, Taylor and Francis, Hemisphere, NY, 2001, 1990, 3rd printing.
|
8 |
N.E. Todreas, M.S. Kazimi, Nuclear Systems: Vol. II, Elements of Thermal Hydraulic Design, Hemisphere, NY, 1990.
|
9 |
NUREG/CR-2815 BNL-NUREG-51559, Probabilistic Safety Analysis Procedure Guide, January 1984.
|
10 |
CAFTA Fault Tree Analysis System, Electric Power Research Institute, January 2009, Version 5.4.
|
11 |
MAAP, "Transmittal Document for MAAP5 Code Revision MAAP 5.02," Prepared by Fauske & Associates, LLC, FAI/13e0801, November 2013.
|
12 |
R.O. Gauntt, et al., MELCOR Computer Code Manuals, vols. 1 and 2, Sandia National Laboratories, September 2005. NUREG/CR-6119, Revision 3, SAND2005-5713, Version 1.8.6.
|
13 |
ASME/ANS RA-Sa-2009, Addenda to ASME/ANS RA-S-2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, 2009.
|
14 |
NUREG/CR-4467, D.J. Alpert, et al., Relative Importance of Individual Elements to Reactor Accident Consequences Assuming Equal Release Fractions, SAND85-2575, Sandia National Laboratory, March 1986.
|
15 |
M. Stamatelatos, G. Apostolakis, H. Dezfuli, C. Everline, S. Guarro, P. Moieni, A. Mosleh, T. Paulos, R. Youngblood, Probabilistic Risk Assessment Procedure Guide for NASA Managers and Practitioners, Prepared for Office of Safety and Mission Assurance NASA Headquarters Washington, August 2002, ww.hq.nasa.gov/office/codeq/doctree/praguide.pdf.
|