Analysis of the technical status of multiunit risk assessment in nuclear power plants |
Seong, Changkyung
(Department of Nuclear Engineering, Kyung Hee University)
Heo, Gyunyoung (Department of Nuclear Engineering, Kyung Hee University) Baek, Sejin (Department of Nuclear Engineering, Kyung Hee University) Yoon, Ji Woong (Department of Public Administration, Kyung Hee University) Kim, Man Cheol (School of Energy Systems Engineering, Chung-Ang University) |
1 | A. Bareith, D. Hollo, Z. Karsa, P. Siklossy, T. Siklossy, A pilot study on developing a site risk model, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Walkerhill, Seoul, Korea, October 2-7, 2016. |
2 | S.C. Jang, H.G. Lim, The use of importance measures for quantification of multi-unit risk, in: Transactions of the Korean Nuclear Society Autumn Meeting (KNS 2015), Gyeongju, Korea, October 29-30, 2015. |
3 | M. Dennis, M. Modarres, A. Mosleh, Framework for assessing integrated site risk of small modular reactors using dynamic probabilistic risk assessment simulation, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Walkerhill, Seoul, Korea, October 2-7, 2016. |
4 | H.G. Lim, S.H. Han, J.E. Yang, Research status of multi-unit PSA methodology in Korea, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Walkerhill, Seoul, Korea, October 2-7, 2016. |
5 | K. Jin, G. Heo, Study on LOOP and SBO frequency for multi-unit PSA, in: Transactions of the Korean Nuclear Society Autumn Meeting (KNS 2016), Jeju, Korea, May 12-13, 2016. |
6 | D.S. Kim, J.H. Park, H.G. Lim, Multi-unit initiating event analysis for a singleunit internal events level 1 PSA, in: Transactions of the Korean Nuclear Society Autumn Meeting (KNS 2016), Jeju, Korea, May 12-13, 2016. |
7 | D.S. Kim, J.H. Park, H.G. Lim, Considering dual-unit loss of offsite power initiating event in a single-unit level 1 PSA, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Walkerhill, Seoul, Korea, October 2-7, 2016. |
8 | D.S. Kim, J.H. Park, H.G. Lim, The contribution to site core damage frequency from independent occurrences of initiators in two or more units: how low is it?, in: Transactions of the Korean Nuclear Society Autumn Meeting (KNS 2016), Gyeongju, Korea, October 27-28, 2016. |
9 | K.N. Fleming, On the risk significance of seismically induced multi-unit accidents, in: International Topical Meeting on Probabilistic Safety Assessment and Analysis (PSA 2015), Sun Valley, Idaho, USA, April 26-30, 2015. |
10 | K. Ebisawa, T. Teragaki, S. Nomura, H. Abe, M. Shigemori, M. Shimomoto, Concept and methodology for evaluating core damage frequency considering failure correlation at multi units and sites and its application, Nucl. Eng. Des. 288 (2015) 82-97. DOI |
11 | W. Epstein, Earthquakes, safety goals and multi-units, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Walkerhill, Seoul, Korea, October 2-7, 2016. |
12 | A. Kreuser, G. Johanson, Recent insights from the International Common Cause Failure Data Exchange (ICDE) Project, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Walkerhill, Seoul, Korea, October 2-7, 2016. |
13 | Central intelligence agency, National Land Area, the World Factbook, 01, 2017. https://www.cia.gov/library/publications/the-world-factbook/geos/ks.html. (Accessed 16 October 2017). |
14 | J. Wood, A. Georgiadis, M. Hakansson, G. Johanson, A. Kreuser, ICDE project collection and analysis of common-cause failures of emergency diesel generators, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Walkerhill, Seoul, Korea, October 2-7, 2016. |
15 | K. Dinnie, Considerations for future development of SAMG at multiple-unit sites, in: Probabilistic Safety Assessment and Management (PSAM 11), Helsinki, Finland, June 25-29, 2012. |
16 | IAEA, Attributes of Full Scope Level 1 Probabilistic Safety Assessment (PSA) for Applications in Nuclear Power Plants, IAEA-TECDOC-1804, October 2016. |
17 | US NRC, ASME Standard for PRA for Nuclear Power Plant Applications and Supporting White Paper, July 31, 2001. |
18 | IAEA, Number of power reactors by country and status, International atomic energy agency power reactor information system (IAEA PRIS). https://www.iaea.org/PRIS/CountryStatistics/CountryStatisticsLandingPage.aspx. (Accessed 16 October 2017) |
19 | Ministry of government administration and home affairs, Number of Inhabitants, Government Registration of Resident Population in Administration, 07, 2014. http://rcps.egov.go.kr:8081/jsp/stat/ppl_stat_jf.jsp. (Accessed 16 October 2017). |
20 | J.E. Yang, Development of an integrated risk assessment framework for internal/external events and all power modes, Nucl. Eng. Technol. 44 (2012) 459-470. DOI |
21 | K. Oh, J.H. Na, H.J. Jeon, K.I. Bahng, Industry R&D Plans for the site risk management and safety goal in Korea, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Seoul, Korea, October 2-7, 2016. |
22 | M. Modarres, Multi-unit nuclear plant risks and implications of the quantitative health objectives, in: International Topical Meeting on Probabilistic Safety Assessment and Analysis (PSA 2015), Sun Valley, Idaho, USA, April 26-30, 2015. |
23 | G. Heo, Development of Regulatory R&D Roadmap for Multi-Unit Risk Using Advanced Single-Unit PSA Models, http://www.ndsl.kr/ndsl/search/detail/report/reportSearchResultDetail.do?cn=TRKO201700000396 |
24 | Y. Akl, S. Yalaoui, Fukushima accident implications on PSA and on the regulatory framework in Canada, in: Probabilistic Safety Assessment and Management (PSAM 12), Sheraton Waikiki, Honolulu, Hawaii, USA, June 22-27, 2014. |
25 | K.N. Fleming, Motivations and challenges for multi-unit PRAs, in: ANS PSA 2013 International Topical Meeting on Probabilistic Safety Assessment and Analysis (PSA 2013), Columbia, South Carolina, USA, September 22-26, 2013. |
26 | I.S. Kim, S.R. Kim, M. Jang, Regulatory considerations of multi-unit site risk, in: Transactions of the Korean Nuclear Society Spring Meeting (KNS2016), Jeju, Korea, May 12-13, 2016. |
27 | S. Zhang, J. Tong, J. Zhao, An integrated modeling approach for event sequence development in multi-unit probabilistic risk assessment, Reliab. Eng. Syst. Saf. 155 (2016) 147-159. DOI |
28 | S. Samaddar, K. Hibino, O. Coman, technical approach for safety assessment of multi-unit NPP sites subject to external events, in: Probabilistic Safety Assessment and Management (PSAM 12), Sheraton Waikiki, Honolulu, Hawaii, USA, June 22-27, 2014. |
29 | S. Schroer, M. Modarres, An event classification schema for evaluating site risk in a multi-unit nuclear power plant probabilistic risk assessment, Reliab. Eng. Syst. Saf. 117 (2013) 40-51. DOI |
30 | K. Kiper, A. Maioli, A Framework for addressing site integrated risk, in: International Topical Meeting on Probabilistic Safety Assessment and Analysis (PSA2015), Sun Valley, Idaho, USA, April 26-30, 2015. |
31 | I.S. Kim, M. Jang, S.R. Kim, Holistic approach to multi-unit site risk assessment : status and issues, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Seoul, Korea, October 2-7, 2016. |
32 | G. Heo, M.C. Kim, J.W. Yoon, I.S. Kim, M. Jae, Gap analysis between single-unit and multi-unit PSAs for Korean NPPs, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Seoul, Korea, October 2-7, 2016. |
33 | M.A. Stutzke, Scoping estimates of multi unit accident risk, in: Probabilistic Safety Assessment and Management (PSAM 12), Sheraton Waikiki, Honolulu, Hawaii, USA, June 22-27, 2014. |
34 | T.D.L. Duy, D. Vasseur, E. Serdet, Probabilistic safety assessment of twin-unit nuclear sites: methodological elements, Reliab. Eng. Syst. Saf. 145 (2016) 250-261. DOI |
35 | V. Hassija, C.S. Kumar, K. Velusamy, Probabilistic safety assessment of multiunit nuclear power plant sites - an integrated approach, J. Loss Prev. Process Ind. 32 (2014) 52-62. DOI |
36 | C.S. Kumar, V. Hassija, K. Velusamy, V. Balasubramaniyan, Integrated risk assessment for multi-unit, NPP sitese-a comparison, Nucl. Eng. Des. 293 (2015) 53-62. DOI |
![]() |