1 |
S.H. Kim, K.M. Jung, S.U. Lee, H.C. Shin, C.H. Kim, Y.C. Seo, Y.G. Bae, Innovative robot technologies for nuclear power plant inspection and maintenance, in: ICONE22, Int. Conf. Nucl. Engr., July 7-11, 2014. Prague.
|
2 |
R.R. Murphy, Disaster Robotics, The MIT Press, Cambridge, MA, 2014.
|
3 |
B. Siciliano, O. Khatib (Eds.), Springer Handbook of Robotics, Springer-Verlag, Berlin, 2008.
|
4 |
B.S. Dhillon, Robot Reliability and Safety, Springer-Verlag, New York, 1991.
|
5 |
DARPA Robotics Challenge (DRC), [Internet]. 2015. Available from: www.darpa.mil/program/darpa-robotics-challenge. [Accessed June 23, 2017]
|
6 |
Y. Choi, K.M. Jeong, I.S. Kim, Strategy to Enhance Applicability of the KAERI's Remote Response Technology, Trans Am Nucl Soc, San Antonio, TX, June 7-11, 2015.
|
7 |
M. Modarres, What Every Engineer Should Know About Reliability and Risk Analysis, Marcel Dekker, New York, 1993.
|
8 |
M. Modarres, I.S. Kim, Deterministic and probabilistic safety analysis, in: D.G. Cacuci (Ed.), Handbook of Nuclear Engineering, Springer Science, New York, 2010, pp. 1742-1812.
|
9 |
Nuclear Energy Institute, B.5.b Phase 2 & 3 Submittal Guideline, NEI-06-12, Rev. 3, Nuclear Energy Institute, Washington, DC, 2009.
|
10 |
Nuclear Energy Institute, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, NEI-12-06, Nuclear Energy Institute, Washington, DC, 2012.
|
11 |
ASME/ANS RA-Sa-2009, Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, American Society of Mechanical Engineers, New York, 2009.
|
12 |
U.S. Nuclear Regulatory Commission, State-of-the-Art Reactor Consequence Analyses (SOARCA) Report, NUREG-1935, U.S. Nuclear Regulatory Commission, Washington, DC, 2012.
|
13 |
Institute of Nuclear Power Operations (INPO), Special Report on the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station, INPO 11-1005, INPO, Atlanta (GA), 2011.
|
14 |
Arizona Public Service Company, APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-design-basis External Events, Arizona Public Service Company, Phoenix (AZ), February 28, 2013.
|
15 |
J.A. Julius, J. Grobbelaar, K. Kohlhepp, Advancing human reliability analysis methods for external events with a focus on seismic, in: Probabilistic Safety Assessment and Management, PSAM12, June 22-27, 2014. Hawaii.
|
16 |
U.S. Nuclear Regulatory Commission, Reevaluation of Station Blackout Risk at Nuclear Power Plants, Analysis of Loss of Power Events: 1986-2004, NUREG/CR-6890, U.S. Nuclear Regulatory Commission, Washington, DC, 2005.
|
17 |
M.V.D. Borst, H. Schoonakker, An overview of PSA importance measures, Rel. Engr. Sys. Saf. 72 (2001) 241-245.
DOI
|
18 |
J.-E. Holmberg, U. Pulkkinen, T. Rosqvist, K. Simola, Decision Criteria in PSA Applications, VTT Automation, Finland, 2001.
|
19 |
U.S. Nuclear Regulatory Commission, Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8, NUREG/CR-7039, U.S. Nuclear Regulatory Commission, Washington, DC, 2011.
|
20 |
U.S. Nuclear Regulatory Commission, Systems Analysis Programs for Handson Integrated Reliability Evaluations (SAPHIRE) Version 8, NUREG/CR-7039, U.S. Nuclear Regulatory Commission, Washington, DC, 2011.
|