Browse > Article
http://dx.doi.org/10.1016/j.net.2017.01.005

Advanced Reactor Passive System Reliability Demonstration Analysis for an External Event  

Bucknor, Matthew (Argonne National Laboratory)
Grabaskas, David (Argonne National Laboratory)
Brunett, Acacia J. (Argonne National Laboratory)
Grelle, Austin (Argonne National Laboratory)
Publication Information
Nuclear Engineering and Technology / v.49, no.2, 2017 , pp. 360-372 More about this Journal
Abstract
Many advanced reactor designs rely on passive systems to fulfill safety functions during accident sequences. These systems depend heavily on boundary conditions to induce a motive force, meaning the system can fail to operate as intended because of deviations in boundary conditions, rather than as the result of physical failures. Furthermore, passive systems may operate in intermediate or degraded modes. These factors make passive system operation difficult to characterize within a traditional probabilistic framework that only recognizes discrete operating modes and does not allow for the explicit consideration of time-dependent boundary conditions. Argonne National Laboratory has been examining various methodologies for assessing passive system reliability within a probabilistic risk assessment for a station blackout event at an advanced small modular reactor. This paper provides an overview of a passive system reliability demonstration analysis for an external event. Considering an earthquake with the possibility of site flooding, the analysis focuses on the behavior of the passive Reactor Cavity Cooling System following potential physical damage and system flooding. The assessment approach seeks to combine mechanistic and simulation-based methods to leverage the benefits of the simulation-based approach without the need to substantially deviate from conventional probabilistic risk assessment techniques. Although this study is presented as only an example analysis, the results appear to demonstrate a high level of reliability of the Reactor Cavity Cooling System (and the reactor system in general) for the postulated transient event.
Keywords
Advanced Reactor PSA; Passive System Reliability; Reactor Cavity Cooling System; Risk Assessment;
Citations & Related Records
연도 인용수 순위
  • Reference
1 A.J. Brunett, M. Bucknor, D. Grabaskas, A passive system reliability analysis for a station blackout, Proceedings of ICAPP 2015, Nice, France, May 3-6, 2015.
2 G. Apostolakis, M. Cunningham, C. Lui, G. Pangburn, W. Reckley, A Proposed Risk Management Regulatory Framework, NUREG-2150, U.S. Nuclear Regulatory Commission, 2012.
3 M. Marques, J.F. Pignatel, P. Saignes, F. D'Auria, L. Burgazzi, C. Mueller, R. Bolado Ravin, C. Kirchsteiger, V. La Lumia, I. Ivanov, Methodology for the reliability evaluation of a passive system and its integration into a probabilistic safety assessment, Nucl. Eng. Des. 235 (2005) 2612-2631.   DOI
4 U.S. Department of Energy, Preliminary Safety Information Document for the Standard MHTGR, HTGR-86-024, Vol. 1, Amendment 13, 1992.
5 U.S. Department of Energy, Preliminary Safety Information Document for the Standard MHTGR, HTGR-86-024, 1986.
6 Idaho National Laboratory, Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8: User's Guide, 2011.
7 U.S. Department of Energy, Probabilistic Risk Assessment for the Standard Modular High Temperature Gas-Cooled Reactor, DOE-HTGR-86-011, 1987.
8 General Electric, PRISM Preliminary Safety Information Document, GEFR-00793, UC-87Ta, San Jose, CA, 1987.
9 U.S. Nuclear Regulatory Commission, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, NUREG-0800 Revised, 2010.
10 The RELAP5-3D Code Development Team, RELAP5-3D Code Manual, Idaho National Laboratory, Idaho Falls, ID, INEEL-EXT-98-00834, Rev. 4, 2012.
11 S. Lomperski, W.D. Pointer, C.P. Tzanos, T.Y.C. Wei, A.R. Kraus, Air-cooled option RCCS studies and NSTF preparation, ANL-GenIV-179, 2011.
12 D. Grabaskas, M. Bucknor, A. Brunett, M. Nakayama, Quantifying safety margin using the Risk-Informed Safety Margin Characterization (RISMC), Proceedings of PSA 2015, Sun Valley, ID, April 26-30, 2015.