Browse > Article
http://dx.doi.org/10.1016/j.net.2015.06.010

EVALUATION OF AN ACCIDENT MANAGEMENT STRATEGY OF EMERGENCY WATER INJECTION USING FIRE ENGINES IN A TYPICAL PRESSURIZED WATER REACTOR  

PARK, SOO-YONG (Korea Atomic Energy Research Institute)
AHN, KWANG-IL (Korea Atomic Energy Research Institute)
Publication Information
Nuclear Engineering and Technology / v.47, no.6, 2015 , pp. 719-728 More about this Journal
Abstract
Following the Fukushima accident, a special safety inspection was conducted in Korea. The inspection results show that Korean nuclear power plants have no imminent risk for expected maximum potential earthquake or coastal flooding. However long- and short-term safety improvements do need to be implemented. One of the measures to increase the mitigation capability during a prolonged station blackout (SBO) accident is installing injection flow paths to provide emergency cooling water of external sources using fire engines to the steam generators or reactor cooling systems. This paper illustrates an evaluation of the effectiveness of external cooling water injection strategies using fire trucks during a potential extended SBO accident in a 1,000 MWe pressurized water reactor. With regard to the effectiveness of external cooling water injection strategies using fire engines, the strategies are judged to be very feasible for a long-term SBO, but are not likely to be effective for a short-term SBO.
Keywords
Emergency water supply; Fire engine; MAAP5 program; Severe accident management strategy; Station blackout accident;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 NUREG-1935 USNRC, State-of-the-Art Reactor Consequence Analyses (SOARCA) Report, 2012.
2 J.E. Yang, Fukushima Dai-ichi accident: lessons learned and future actions from the risk perspectives, Nucl. Eng. Technol. 46 (2014) 27-38.   DOI
3 KINS, Sixth National Report for the Convention on Nuclear Safety, 2013.
4 H.C. Kim, Inspection and validation activities on severe accident management in Korea after the Fukushima accident", in: IAEA IEM on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi N.P.P., 2014.
5 S.Y. Park, K.I. Ahn, Comparative analysis of station blackout accident progression in typical PWR, BWR, and PHWR, Nucl. Eng. Technol. 44 (2012) 311-322.   DOI
6 A.S.A. Shehhi, S.H. Chang, S.H. Kim, H.G. Kang, Analysis of economics and safety to cope with station blackout in PWR, Ann. Nucl. Energy 59 (2013) 63-71.   DOI
7 Electric Power Research Institute, Modular Accident Analysis Program Version 5.02, Electric Power Research Institute, 2013.
8 W.A. Stewart, A.T. Pieczynski, V. Srinivas, Experiments on natural circulation flows in steam generators during severe accidents, in: Proc. of the Inter., ANS/ENS Meeting on Thermal Reactor Safety, San Diego, 1986. XIX.6-1 to XIX.6-8.
9 KHNP, Severe Accident Management Guidance for Hanul 3,4 (Under development for Low Power and Shutdown Operation), Korea Hydro & Nuclear Power Co., Ltd, 2013. Internal Report.
10 KHNP, Emergency Operation Procedure for Hanul 3,4 Plants, Korea Hydro & Nuclear Power Co., Ltd, 2002. EOP-07 Rev.4.
11 USNRC, State-of-the-Art Reactor Consequence Analyses Project, Volume 2: Surry Integrated Analysis, NUREG-7110, 2, 2012.